_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Log # TXX-4787 File # 10110 TEXAS UTILITIES GENERATING COMPANY 907.2 SKYW AY TOWER a 400 NORTH OLIVE AfTREE R'. L.B. St. DALLAN. TEX AS 75301 g Cu rw wks pass esse?
IN - 9 BBS jh Mr. Eric H. Johnson, Director
~-
Division of Reactor Safety and Projects U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 P-10 PERMISSIVE SDAR:
CP-86-23 (INTERIM REPORT)
Dear Mr. Johnson:
\\
On April 3, 1986, we verbally notified your Mr. T. F..iesterman of a deficiency involving a potential failure of the react;. protection system-permissive, P-10, to reset during power reduction to below the P-10 setpoint. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).
This evaluation is the result of a notification provided to the NRC by Westinghouse.
We are continuing our evaluation,and anticipate submitting our next report by June 4, 1986.
Very truly yours, h'th W. G. C nsil By:
64 d
G. S. Keeley Manager, Lttr /,n r V
JCH/grr c-NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S.. Nuclear Regulatory Commission Washington, D.C.
20555 8605190031 860505 PDR ADOCK 05000445 S
PDR I $
A inVISION OF TEXAS UTIE2 TIES ELECTRIC mMPANY
.