TXX-4769, Interim Deficiency Rept CP-86-18 Re Design Deficiencies in Operating & Standby Safety Chilled Water Chillers.Initially Reported on 860321.Evaluation Continuing.Next Rept Will Be Submitted by 860521

From kanterella
(Redirected from TXX-4769)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-18 Re Design Deficiencies in Operating & Standby Safety Chilled Water Chillers.Initially Reported on 860321.Evaluation Continuing.Next Rept Will Be Submitted by 860521
ML20203G450
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/21/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-18, TXX-4769, NUDOCS 8604290096
Download: ML20203G450 (1)


Text

c i

Log i TXX-4769 File # 10110 TEXAS UTil.lTIES GENERATING COMPANY 909.4

-v-4,vo....

- r,.ouv.

-1.

.u

. 1..

April 21, 1986

$ $ $ OY.

  • ~

1 Mr. Eric H. Johnson, Director.

MR 2 3 E Division of Reactor Safety and Projects U.S.. Nuclear Regulatory Commission L

611 Ryan Plaza Drive. Suite 1000 l

Arlington, TX 76012'

SUBJECT:

COMANCHE PEAX STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446

' SAFETY CHILLED WATER CHILLER UNITS SDAR:

CP-86-18 (INTERIM REPORT)

Dear Mr. Johnson:

On March.21, 1986, we verbally notified your Mr. R.-Hall of a deficiency involving the starting and operation of the safety chilled water chillers.

This is an interim report of a potentially reportable iteni under the provisions of 10CFR50.55(e)..

l Possible design deficiencies exist in both the operating and standby safety chilled water loops. We are continuing our evaluation and anticipate submitting our next report by May 21, 1986.

Very truly yours, hh$&h W. G. C s1 By:

G. 5. Kee4ey-

/

Manager, Licen'p(ng JCH/grr c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 86047"0096 860421*~

PDR ADOCK 05000445 s