TXX-4758, Interim Deficiency Rept CP-86-14 Re Weld Failure in Component of Class 1E 6.9-kV Switchgear Breaker.Initially Reported on 860311.Insp Activities Underway for All Critical Breakers.Final Rept Expected by 860515
| ML20203L784 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/10/1986 |
| From: | Counsil W, Woodlan D TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-14, TXX-4758, NUDOCS 8605010370 | |
| Download: ML20203L784 (1) | |
Text
Log # TXX-4758 File # 10110 908.3 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER
- 400 NORTH OtJVE frrREET. L.B. 81
- IDALLAS, TEXA8 78301 April 10, 1986
.UMMAf?Jn'.i g
@En W Ngg\\
Mr. Eric H. Johnson, Director
[
Division of Reactor Safety and Projects f
U.S. Nuclear Regulatory Commission g
4,'
611 Ryan Plaza Drive, Suite 1000 J
=
Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 6.9KV SWITCHGEAR BREAKER JACK SLEEVE WELD FAILURE SDAR:
Dear Mr. Johnson:
On March 11, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving a weld failure in a component of a Class IE 6.9KV switchgear breaker.
This is an interim report of a potentially reportable item under the provisions of 10CFR 50.55(e).
Inspection activities are underway for all critical breakers.
Non-critical breakers are being checked using a statistical random sample.
These activities should determine if the failure is isolated or exists as a result of a common failure mode.
We are continuing our evaluation and anticipate completion of our final report by May 15, 1986.
Very truly yours,
- b. b.
W. G. Counsil hkN$k45 By:
h#
PDR D. R. Woodlan Licensing Supervisor JCH/ arm c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission
,p Washington, D.C.
20555 h
-p &
a mvision or raxas uruunas eurernic amraur db.