TXX-4741, Interim Deficiency Rept CP-86-11 Re Bingham-Willamete Supplied Impeller.Intially Reported on 860224.Evaluation Shows Indications Appear to Be Result of Casting Shrinkage Crocks.Next Rept Expected by 860613

From kanterella
(Redirected from TXX-4741)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-11 Re Bingham-Willamete Supplied Impeller.Intially Reported on 860224.Evaluation Shows Indications Appear to Be Result of Casting Shrinkage Crocks.Next Rept Expected by 860613
ML20141A551
Person / Time
Site: Comanche Peak  
Issue date: 03/26/1986
From: Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-11, TXX-4741, NUDOCS 8604040507
Download: ML20141A551 (1)


Text

T OM6 Log # TXX-4741 File # 10110 909.2 TEXAS UTILITIES GENERATING COMPANT hKYW AY TOWER = 400 NOR T14 OLJVE KTRE* T, E,.Il. N R e D AE,1AN. TEX AM 7 S30 8 March 26, 1986 5A"00MfA*.h

j d!

'o l$3 Mr. Eric H. Johnson, Director q

Division of Reactor Safety and Projects fU l

U. S. Nuclear Regulatory Commission

-a 611 Ryan Plaza Drive, Suite 1000 L

Arlington, Texas 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NO. 50-445 AND 50-446 COMPONENT COOLING WATER PUMP IMPELLER SDAR:

CP-86-11 INTERIM REPORT

Dear Mr. Johnson:

On February 24, 1986, we verbally notified you of a deficiency involving a Unit 2 Component Cooling Water (CCW) pump impeller.

This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

Our evaluation has shown the indications appear to be the result of casting shrinkage cracks.

Since the indications have been observed on both Unit 2 installations and the replacement " spare" impeller, we have expanded this issue to include the Unit 1 installations. This action was necessary since investigations have indicated the CCW pump impellers provided by the supplier (Bingham-Willamete) for both units were manufactured using a typi-cal casting.

We are continuing our evaluation nd anticipate submitting our next report by June 13, 1986.

Very truly yours, W. G. Counsil

) k//

/

jl By:

}

G. S. Kd'eley K /,

Manager, Nuclear p ensing JWA/ arm c-Region IV (Original + 1 copy)

Director, Inspection and Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 h'