Text
Log i TXX-4733 File # 10110 908.1 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH O1JVE NTREET. l.35. SI e DAtl.AN. TEX AS 78303 March 17, 1986
- n"At*?.f.".0, fSMU??5?
l Mr. Eric H. Johnson, Director e c Division of Reactor Safety and Projects l
g g-l g j,i l
U. S. Nuclear Regulatory Commission h
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 1
.-a
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 ELECTRIC PENETRATION ASSEMBLIES SDAR: CP-86-10
Dear Mr. Johnson:
On February 14, 1986, we verbally notified your Mr. T. Westerman of a deft-ciency involving electrical penetration assemblies (supplied by Bunker Ramo) which may not have been provided in accordance with design require-ments. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e). This issue is being evaluated as part of Corrective Action Request (CAR) 055. Recent revision (expansion) of this CAR has precluded a complete assessment of the concern at this' time.
We are continuing our evaluation and anticipate completion of our final
-report by April 24, 1986.
Very truly yours, W. G. Counsil 8604020503 960317 By:
I PDR ADOCK 05000445 G. S. Kee h /,
PDR Manager, Nucipe Licensing S
RWH/ arm c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 I J c
a ouvissou or rexas vrzuries euxcrusc couraur
-