TXX-4663, Interim Deficiency Report CP-85-50 Re Improper Welding in Mfg of Cable Tray Tee Fittings.Initially Reported on 851206.Evaluation Continuing.Completion Anticipated by 860228
| ML20137B438 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/06/1986 |
| From: | Beck J, Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-85-50, TXX-4663, NUDOCS 8601150340 | |
| Download: ML20137B438 (1) | |
Text
_ - _.
Log # TXX-4663 TEXAS UTILITIES GENERATING COMPANY File f 10110 sgEYWAY TOWER e ese NoeTM OBJVM WTREsrI*, I.R. E t e IBA8 LAS, TEXAS TSpo t January 6, 1986
- =:.==
T M@ M DVM3 m-626 Mr. Eric H. Johnson, Acting Director Division of Reactor Safety and Projects U.S. Nuclear Regulatory Commission 611 Ryan Plaza Dr., Suite 1000 Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 CABLE TRAY TEE FITTINGS SDAR:
Dear Mr. Johnson:
On December 6, 1985, we verbally notified your Mr. S. Phillips of a deft-ciency regarding improper welding processes in the manufacturing of cable tray " tee" fittings.
We are continuinc our evaluation ar.d anticipate completion by February 28, 1986.
Very truly yours, W. [,. W W. G. Counsil By:
.. deck Vice President JCH/ arm c - NRC Region IV (0+1 copy)
Director, Inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 hD ajo\\c
--