TXX-4661, Interim Deficiency Rept SDAR:CP-85-47 Re Use of Amptector Iia Relays in 480 Switchgear Instead of Specified Relays. Initially Reported on 851202.Evaluation of Relays in safety- Related Switchgears to Be Completed by 860131
| ML20137B090 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/02/1986 |
| From: | Counsil W, Woodlan D TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| SDAR:CP-85-47, TXX-4661, NUDOCS 8601150063 | |
| Download: ML20137B090 (1) | |
Text
-
Log i TXX-4661 File # 10010 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER. 400 NORTH OLIVE RTREET. L.B. 8 8. DALLAS. TEXAS 78208 January 2, 1986 W('$ {=M [TQiji@m m's m
.n=uat.1
'~
it h,
,'I ; 3 4 - 7 1986 !! !~
Mr. Eric H. Johnson, Acting Director
$a4 Division of Reactor Safety and Projects i
U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 J
Arlington, TX 76012
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 USE OF AMPTECTOR IIA RELAYS SDAR:
Dear Mr. Johnson:
On December 2, 1985, we verbally notified your Mr. S. Phillips of a deficiency regarding the use of Amptector IIA relays in the 480 volt switchgear instead of specified Amptector II relays. We are still deter-mining all applications of Amptector IIA. relays in the safety related switchgears and their qualifications.
We are continuing our evaluation and anticipate completion by January 31, l
1986.
i l
Very truly yours, l
tu. C, O I
W. G. Counsil By:
A%
D.R. Woodlan Licensing Supervisor JCH/ arm c - NRC Region IV (0+1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8601150063 860102 PDR ADOCK 05000445 S
PDR l
?90
((4]
0 m,-,
. _,c--
l(O