Interim Deficiency Rept SDAR-188 Re Concrete Debris in Gap Between Fuel & Auxiliary Bldgs.Initially Reported on 850726. Evaluation Continuing & Completion Anticipated by 851004
ML20137G369
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/16/1985
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-188, TXX-4537, NUDOCS 8508270280
Download: ML20137G369 (1)


Text

M@M.0W[iF' O

TEXAS UTILITIES GENERATING COMPANY

, ij

[

MKYWAY Tt) WEN

  • Soit NilitTH 4) LIVE MTHEET. L.R. ml
  • DALLA 4e TEXAM 73201 mm.ve vic.cou.n.s.a..

August 16, 1985 wimAu.

TXX-4537 Mr. D.R. Hunter, Chief Reactor Project Branch 2 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:

50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION CONCRETE DEBRIS IN SEPARATION GAP QA FILE: CP-85-27, SDAR-188 FILE NO.:

10110

Dear Mr. Hunter:

On July 26, 1985 we verbally notified your Mr. S. Phillips of a deficiency regarding concrete debris found in the separation gap between the Fuel and Auxiliary Buildings. This debris could produce a significant increase in the Seismic Category I building response during an SSE.

We are continuing our evaluation and anticipate completion by October 4, 1985.

Very truly yours, Z

W.G. Counsil WGC:tig cc: NRC Region IV - (0 + 1 copy)

Director. Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission Washington, DC 20555

^'