TXX-4335, Interim Deficiency Rept SDAR-154 Re Safe Shutdown Analysis Evaluations Not Considering Potential Fire in Hvac.Initially Reported on 840913.Evaluation Continuing.Next Rept Expected by 841106

From kanterella
(Redirected from TXX-4335)
Jump to navigation Jump to search
Interim Deficiency Rept SDAR-154 Re Safe Shutdown Analysis Evaluations Not Considering Potential Fire in Hvac.Initially Reported on 840913.Evaluation Continuing.Next Rept Expected by 841106
ML20106E024
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/12/1984
From: Clements B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-154, TXX-4335, NUDOCS 8410260267
Download: ML20106E024 (1)


Text

.,,

fg TEXAS UTILITIES GENERATING ' COMPANY MKYWAY TOWEN

  • 600 NONTH OLIVE NTHEET, L.H. M1
  • DALLAM, TEXAM 73201

'f c.Ed!"d!%"1

- S October 12, 1984 TXX-4335 Mr. D.R. Hunter, Chief Reactor Pro,iect Branch 2 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket No.:

50-445

, Arlington, TX 76012-50-446 COMANCHE PEAK STEAM ELECTRIC STATION CONTROL ROOM HVAC i-QA FILE: CP-84-29, SDAR-154 FILE NO.:

10110 7:

Dear Mr. Hunter:

On September 13, 1984 we verbally notified your Mr. D. Hunnicutt of a deficiency

.regarding the safe shutdown analysis' evaluations which did not consider a potential fire which could affect habitability of control room and alternate shutdown capability.

We are continuing'our evaluation and anticipate completion by Novembe-6.

1984.

' M @ [iQ [}M(

Very truly yours, li- ~

OCTl-51984 BRC:tig cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission Washington, DC 20555 f

8410260267 841012 PDR ADOCK 05000445 s

PDR 4

gn py

-q e