TXX-4332, Interim Deficiency Rept SDAR-146 Re Design of Primary Coolant Component Water Sys.Initially Reported on 840924. Evaluation Continuing.Completion Expected by 841106

From kanterella
(Redirected from TXX-4332)
Jump to navigation Jump to search
Interim Deficiency Rept SDAR-146 Re Design of Primary Coolant Component Water Sys.Initially Reported on 840924. Evaluation Continuing.Completion Expected by 841106
ML20106E143
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 10/12/1984
From: Clements B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-146, TXX-4332, NUDOCS 8410290048
Download: ML20106E143 (1)


Text

V TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWEM

  • 400 NORTIE OI,IVE MTHEET. I,.El. MI
  • E3AI,1.AM, TEXAM 75208 c.c. ".'f J "' E '""."l b.

October 12, 1984 TXX-4332 Mr. D.R. Hunter, Chief Reactor Project Branch 2 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket No.:

50-445 i

Arlington, TX 76012 COMANCHE PEAK STEAM ELECTRIC STATION CCW SYSTEM DESIGN CONCERN QA FILE: CP-84-22, SDAR-146 FILE N0.:

10110

Dear Mr. Hunter:

On August 24, 1984 we verbally notified your Mr. D. Hunnicutt of a deficiency regarding a concern in the design of the primary coolant and component water (CCW) system. -We have submitted an interim report logged TXX-4311 dated September 24, 1984.

We are. continuing our evaluation and anticipate completion by November 6, 1984.

Very truly yours, M@20MM-4 C:C OCTI51984 M

BRC:tig

-cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission Washington, DC 20555 8410290048 841012

~

PDR ADOCK 05000445 s

PDR 3g

..,...............,... -