TXX-4309, Final Deficiency Rept SDAR-144 Re Matl Defect of Delivery Valve Holder in Diesel Generator Fuel Injection Pump. Initially Reported on 840720.Investigation Concluded Matter Not Reportable Per 10CFR50.55(e)

From kanterella
(Redirected from TXX-4309)
Jump to navigation Jump to search
Final Deficiency Rept SDAR-144 Re Matl Defect of Delivery Valve Holder in Diesel Generator Fuel Injection Pump. Initially Reported on 840720.Investigation Concluded Matter Not Reportable Per 10CFR50.55(e)
ML20093C714
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/21/1984
From: Clement B, Clements B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-144, TXX-4309, NUDOCS 8410100663
Download: ML20093C714 (1)


Text

m TEXAS UTILITIES GENERATING COMPANY MMYWAY TOWEN . 400 NORTH OLIVE MTHEET. L.B. 858

  • DALLAM. TEXAtt 73201

,, September 21, 1984 m,-.u.. y n.

muur.u.ent..s . TXX-4309 AM@MDMM  %

Mr. D.R. Hunter SEP 2 7 m Reactor Project Branch 2 U.S. Nuclear Regulatory Commission .

J Office of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: 50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION DIESEL GENERATOR MATERIAL DEFECT (DELIVERY VALVE HOLDER)

QA FILE: CP-84-20, SDAR-144 FILE N0.: 10110

Dear Mr. Hunter:

On July 20, 1984 we verbally notified your Mr. Hunnicutt of a deficiency regarding a possible material defect in the Diesel Generator Fuel Injection Pump delivery valve holder.

We have completed our investigation and concluded that the matter is not reportable under 10CFR50.55(e). Records supporting this determination are available for your inspector's review at the CPSES site.

Very truly yours, BRC:tig I

cc: NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission  !

Washington, DC 20555 8410100663 840921 gDRADOCK05000 A DEVINION tW TEXAH ETELET8EN ELECTREC COMI*ANY ,

d'