TXX-4095, Deficiency Rept Re Linear Indications in Emergency Diesel Generator Auxiliary Skids.Skids Will Be Scrapped.Replacement Structures Will Be Fabricated at Jobsite Per Site Engineering Drawings by Sept 1984

From kanterella
(Redirected from TXX-4095)
Jump to navigation Jump to search
Deficiency Rept Re Linear Indications in Emergency Diesel Generator Auxiliary Skids.Skids Will Be Scrapped.Replacement Structures Will Be Fabricated at Jobsite Per Site Engineering Drawings by Sept 1984
ML20079H359
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 01/10/1984
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
TXX-4095, NUDOCS 8401230410
Download: ML20079H359 (2)


Text

-

\\.

TEXAS UTILITIES GENERATING COMIRNY mn imm ww e unu_mm m,um R. J. GARY a='ET.f.".Jf!!T January 10, 1984 TXX-4095

$ Yb$=

\\\\

$\\6 Y Mr. E. H. Johnson, Chief

~ ~,,

Reactor Project Branch I w

U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:

50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION UNIT 2 DIESEL GENERATOR AUXILIARY SKID QA FILE: CP 82-06, SDAR-82 FILE N0.:

10110

Dear Mr. Johnson:

In accordance with 10CFR50.55(e), we are submitting the enclosed report of actions taken to correct a deficiency regarding linear indications in the Unit 2 emergency diesel generator auxiliary l

skid.

Supporting documentation is available at the CPSES site for your Inspectort review.

Very truly yours, RJG:ln cc: NRC Region IV - (0 + 1 copy)

Diractor, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, DC 20555 8401230410 e4 otto PDR ADOCK 05000446 S

PDR f

3I s\\\\

f

-TXX-4095 January 10, 1984 ATTACHMENT UNIT 2 DIESEL GENERATOR AUXILIARY SKID Description During inspection by Site Quality Control, linear indications were observed in the Unit 2 Number 2 emergency diesel generator auxiliary skid (support structure).

The skid was provided by the supplier (Transamerica DeLaval) as part of the diesel generator package. Further inspections yielded additional base metal defects which have been documented by site nonconformance reports.

Safety Implications Due to the indeterminate structural integrity of the auxiliary skids, the operability of the emergency diesel generators could not be assured during a seismic event.

Corrective Actions The existing auxiliary skids will be scrapped. The replacement structures will be fabricated at the jobsite in accordance with drawings prepared by site engineering. All site activities will be performed per established engineering and construction procedures.

(

Corrective actions are currently underway. Completion of these l

activities should be no later than September, 1984.