TXX-3541, Interim Deficiency Rept Re Westinghouse RCS Wide Range Pressure Measurements,Initially Reported 820408.Evaluation in Progress.Next Rept Will Be Provided by 820917

From kanterella
(Redirected from TXX-3541)
Jump to navigation Jump to search
Interim Deficiency Rept Re Westinghouse RCS Wide Range Pressure Measurements,Initially Reported 820408.Evaluation in Progress.Next Rept Will Be Provided by 820917
ML20055A940
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/15/1982
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, TXX-3541, NUDOCS 8207200151
Download: ML20055A940 (1)


Text

TEXAS UTILITIES GENERATING COMinNY 2001 DILYAN 11)WEli. DAL1AM. TEX AM 75201 b_E "l:bbYb:::'

' Y(-

i g l6y July 15, 1982 TXX-3541 Mr. G. L. Madsen, Chief Reactor Projects Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos. 50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION WESTINGHOUSE RCS WIDE RANGE PRESSURE MEASUREMENTS FILE NO:

10110

Dear Mr. Madsen:

On April 8, 1982, we verbally informed your Mr. R. G. Taylor of a deficiency identified regarding Westinghouse wide range pressure measurements. On May 7,1982, we submitted an interim report logged TXX-3514.

t We are continuing our evaluation and anticipate completion by September 17, 1982.

Very truly yours, R.

. Gary RJG:pko cc: NRC Region IV - (0 + 1 copy)

Director, Inspection and Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.

U.S. Nuclear Regulatory Commission Washington, DC 20555 D

8207200151 820715 PDR ADOCK 05000445 S

PDR

-