TXX-3457, Interim Deficiency Rept Re Eight Underspecified 3/4-inch Auxiliary Feedwater Sys Valves,Initially Reported on 811207. Evaluation Ongoing.Completion Anticipated by 820305
| ML20039F589 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/31/1981 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, TXX-3457, NUDOCS 8201130126 | |
| Download: ML20039F589 (1) | |
Text
_,
1
\\
L' TEXAS UTILITIES GENERATING COMPANY l <
m ImYAN TOWEn
- D.MMM.TEXAH WOI A
S e_i;$.;.?.* n..,
b W
9 December 31, 1981 T
J AN 1'11982
- TXX-3457 i n re mrniu aa 10 rux unearx n -
T.CC Mr. G. L. Madsen, Chief Reactor Projects Branch U. S. Nuclear Regulatory Comission Office of Inspection and Enforcement 611 Ryan Piaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, TX 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION UNDERSPECIFIED AUXILIARY FEEDWATER SYSTEM VALVES i
FILE NO. 10110
Dear Mr. Madsen:
On December 7,1981, we verbally infonned your Mr. R. G. Taylor of a deficiency regarding eight 3/4 inch valves in the Auxiliary Feedwater System that have been underspecified in terms of their pressure /
temperature ratings.
We are continuing our evaluation and anticipate completion by March 5, 1982.
Very truly yours,
,k
,- )
[
R. J. Gary 3
RJG:pko 1
cc: - NRC Region IV - (0 + 1 copy)
Director, Inspection & Enforcement - (15 copies) c/o ~ Distribution Services Branch, DDC, ADM.
U. S. iluclear Regulatory Comission Washington, DC 20555 I
t 4
<F
.c B20113oig 8' 'hjj M ADOCR ON>o 1
S 5
i PDR J
I
- i..
c
......i.._...___mm-.--------m------
-