TXX-3219, Deficiency Rept Re Thread Engagement of Sway Struts. Condition Not Reportable Under 10CFR50.55e,as Reported on 800919

From kanterella
(Redirected from TXX-3219)
Jump to navigation Jump to search
Deficiency Rept Re Thread Engagement of Sway Struts. Condition Not Reportable Under 10CFR50.55e,as Reported on 800919
ML19338F480
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/15/1980
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, TXX-3219, NUDOCS 8010200416
Download: ML19338F480 (1)


Text

.

TEXAS UTILITIES GENERATING COMPANY 2001 DHYAN TOWED

".":r'J.'.J." "'.!?l,

Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Comission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445.

Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION THREAD ENGAGEMENT OF SWAY STRUTS FILE N0:

10110

Dear Mr. Seidle:

On September 19, 1980, we verbally informed your Mr. R. G. Taylor that we were evaluating a condition involving sway strut units'which do not have threads upset as a potentially reportable deficiency within the definitions of 10 CFR 50.55(e).

We have completed our investigation and have concluded. that the matter is not reportable under 10 CFR 50.55(e).

Records supporting this deter-mination are available for your Inspector's review at the CPSES site.

Very truly yours, R. J. Gary RJG:dk cc:

NRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 8010200 416 l