TAC:MF7151
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
| From | |
MONTHYEARNL-15-139, Relief Request IP2-1SI-RR-02 Alternative Examination Volume Required by Code Case N-729-12015-12-0909 December 2015
[table view]Relief Request IP2-1SI-RR-02 Alternative Examination Volume Required by Code Case N-729-1 05000247/LER-2016-003, Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable 21 Main Boiler Feedwater Pump Discharge Valve for Greater than the TS Allowed Outage Time2016-05-0606 May 2016 Regarding Technical Specification (TS) Prohibited Condition Due to an Inoperable 21 Main Boiler Feedwater Pump Discharge Valve for Greater than the TS Allowed Outage Time ML16147A5192016-07-14014 July 2016 Safety Evaluation for Relief Request IP2-ISI-RR-02 Alternative Examination Volume Required by Code Case N-729-1 2016-05-06 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:MF7151&oldid=640570"