TAC:MF0408
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
| |
| From | |
MONTHYEARDCL-12-129, Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines2012-12-20020 December 2012
[table view]Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines DCL-12-124, 10 CFR 54.21 (B) Annual Update to the Diablo Canyon Power Plant License Renewal Application and License Renewal Application Amendment Number 462012-12-20020 December 2012 10 CFR 54.21 (B) Annual Update to the Diablo Canyon Power Plant License Renewal Application and License Renewal Application Amendment Number 46 ML13022A0132013-01-22022 January 2013 Acceptance Review Email, Relief Request RVFLNG-INT3 - Alternative to ASME Code Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines, Third 10-Year Inservice Inspection Interval (TAC MF0408-MF0409) ML13074A8182013-03-15015 March 2013 Request for Additional Information Email, Relief Request RVFLNG-INT3 - Alternative to ASME Code Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines, Third 10-Year Inservice Inspection Interval DCL-13-046, Response to NRC Request for Additional Information Regarding Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Pressure Test.2013-04-29029 April 2013 Response to NRC Request for Additional Information Regarding Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Pressure Test. 05000323/LER-2013-001, Regarding Valid EDG 2-1 Start Signal Caused by a Loss of 4KV Class 1E Bus G2013-04-29029 April 2013 Regarding Valid EDG 2-1 Start Signal Caused by a Loss of 4KV Class 1E Bus G ML13192A3542013-09-12012 September 2013 Relief Request RVFLNG-INT3 - Alternative to ASME Code Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines, Third 10-Year Inservice Inspection Interval (TAC MF0408-MF0409) 2013-03-15 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:MF0408&oldid=494165"