TAC:ME2282
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Questions Answers | |
| From | |
MONTHYEARML0925202392009-08-31031 August 2009
[table view]Requests Relief from the Weld Examination Requirements of the ASME Boiler and Pressure Vessel Code, Section X1, as Described in Attached Relief Request 09-MN-006 ML0936315612009-12-17017 December 2009 Relief Request No. 09-MN-006, Revision 1 05000369/LER-2010-003, For McGuire Nuclear Station, Regarding Dropped Control Rods Resulting in Completion of a Technical Specification Required Shutdown and Actuation of the Reactor Protection System and Auxiliary Feedwater System2010-08-11011 August 2010 For McGuire Nuclear Station, Regarding Dropped Control Rods Resulting in Completion of a Technical Specification Required Shutdown and Actuation of the Reactor Protection System and Auxiliary Feedwater System ML1023005252010-08-19019 August 2010 (McGuire 1) - Relief 09-MN-006, Rev. 1, for Limited Weld Examination Coverage 2009-08-31 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:ME2282&oldid=962502"