TAC:MA0542
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
From | |
MONTHYEARML20205P8031999-04-12012 April 1999
[table view]Proposed Tech Specs Re Relaxation of Excess Flow Check Valve Surveillance Testing ML20212H2121999-09-27027 September 1999 Forwards Request for Addl Info Re 990412 Licensee Request to Revise DAEC TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months ML20212J8761999-09-30030 September 1999 Forwards RAI Re Util 990412 Request to Revise Duane Arnold Energy Ctr TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months 1999-09-27 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:MA0542&oldid=3245458"