TAC:60217
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
| From | |
MONTHYEARBECO-87-123, Forwards Suppl to Tech Spec 4.3.C.1, Scram Insertion Times, Per NRC Request.Suppl Modifies Util 851115 Proposed Change by Requiring Operable Control Rods to Be Subjected to Scram Time Test After Reactor Shutdown1987-07-24024 July 1987
[table view]Forwards Suppl to Tech Spec 4.3.C.1, Scram Insertion Times, Per NRC Request.Suppl Modifies Util 851115 Proposed Change by Requiring Operable Control Rods to Be Subjected to Scram Time Test After Reactor Shutdown BECO-88-052, Forwards Addl Info Supporting 851119 Proposed Change to Tech Spec 3/4.3.C Re Scram Insertion Time Per 871022 Request1988-03-14014 March 1988 Forwards Addl Info Supporting 851119 Proposed Change to Tech Spec 3/4.3.C Re Scram Insertion Time Per 871022 Request 1987-07-24 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:60217&oldid=3224377"