TAC:59075
From kanterella
(Redirected from TAC:59076)
Jump to navigation
Jump to search
Request for: Approved, Closed | |
From | |
MONTHYEARIR 05000324/19870071987-04-14014 April 1987
[table view]Insp Repts 50-324/87-07 & 50-325/87-07 on 870330-0403.No Violations or Deviations Noted.Major Areas Inspected:Qc & Confirmatory Measures,Including Lab QC Program,Procedures & Instructions.Criteria & Results for Measurements Encl ML20235A6991987-09-18018 September 1987 Forwards Safety Evaluation Re Installation of Alternate Rod Injection (ARI) Sys & Adequacy of Plant Reactor Coolant Recirculating Pump Trip (RPT) Sys.Request Commitment & Schedule for Upgrading ARI & RPT within 60 Days ML20236P0431987-11-13013 November 1987 Requests That NRC Reevaluate Conclusion on Acceptability of Facility Recirculation Pump Trip Design Based on Info Provided,Per 10CFR50.62.Commitment or Schedule to Upgrade Sys Will Not Be Submitted Until Issue Resolved ML20151T7301988-08-0808 August 1988 Responds to Re Appeal of NRC Position on Plant ATWS Sys Instrument Diversity.Implementation of Unit 1 ATWS Rod Insertion Should Not Be Slowed to Resolve Issue & Extension of Time to Comply W/Rule for Unit 2 Granted ML20235Z3311989-03-0808 March 1989 Forwards Safety Evaluation Supporting Util 871204 Submittal of Design Mod That Allows Testing at Power W/O Preventing Alternate Rod Injection Sys from Responding to Automatic Initiation Signal 1987-09-18 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:59075&oldid=3223631"