TAC:55566
From kanterella
(Redirected from TAC:55567)
Jump to navigation
Jump to search
Request for: Open | |
From | |
MONTHYEARML20094G0221984-08-0101 August 1984
[table view]Forwards Description & Justification for Proposed Piping Seismic Analysis Changes,Adopting Damping Values & Spectra Shifting Methods for Piping Sys,Per Wrc Recommendations, for Review/Approval ML20098E9611984-09-28028 September 1984 Proposed Tech Specs,Changing Surveillance Requirements Re Steam Generator Blowdown Valves (Table 3.6-2) ML20098E9561984-09-28028 September 1984 Application for Amend to Licenses NPF-9 & NPF-17,changing Tech Spec Surveillance Requirements Re Steam Generator Blowdown Valves (Table 3.6-2) ML20101L7021984-12-20020 December 1984 Forwards Revised Description/Justification for Proposed Piping Seismic Analysis Changes Originally Submitted 840801. Delay in Response to 841016 & 18 Telcons Due to Difficulty in Obtaining Code Case N-411 ML20128C4631985-04-25025 April 1985 Special Rept Re Deletion of Certain Steam Generator Blowdown Recycle Sys safety-related Hydraulic & Mechanical Snubbers. Steam Generator Blowdown Sys Mod to Be Implemented During Current Refueling Outage 1984-08-01 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:55566&oldid=3464575"