TAC:48018
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Questions Answers | |
| From | |
MONTHYEARML20049H6461982-02-23023 February 1982
[table view]Discusses Basic Parameters of Reload Design for Cycle 3 & Safety & Operational Aspects of Westinghouse Design of Reload.Fuel Assemblies Will Be Replaced When Unit Returns to Power for Cycle 3 on 820523 ML20041C9871982-02-23023 February 1982 Application to Amend License DPR-66,containing Proposed Change Request 66.Change Modifies Tech Specs on Rod Misalignment,Core Peaking Factor Limits & Associated Parameters.Review & Approval of Changes Requested ML20041F9431982-03-0909 March 1982 Forwards Radial Peaking Factor Limit Rept for Cycle 3, Per Section 6.9.1.10 of Proposed Tech Spec Change Request 66 ML20054E2101982-04-21021 April 1982 Forwards Draft Tech Specs Re Rod Position Indication, Per NRC Request ML20052B5971982-04-26026 April 1982 Forwards Westinghouse Analyses Supporting Retention of RPI Tech Specs for Cycle 3 Operation & Beyond.Proposed Tech Spec Change to Increase Overall Limit,Necessitated by Retention of Existing Tech Specs,Evaluated ML20052E6331982-05-0505 May 1982 Application for Amend to License DPR-66 Consisting of Tech Spec Change 1A-66,re Reload Safety Evaluation & Rod Position Indication.Submittal Supersedes 820223 Application for Amend to Tech Specs ML20053C7641982-05-26026 May 1982 Forwards Amended Tech Spec Pages 3/4 1-19,3/4 1-20b & B 3/4 1-3 Reflecting Change Re Cycle 3 Reload Safety Evaluation,Per 820506 & 0223 Ltrs.Proposed Tech Specs Required for Entry Into Mode 3 by 820604 1982-04-21 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:48018&oldid=4497567"