TAC:43380
From kanterella
(Redirected from TAC:47389)
Jump to navigation
Jump to search
Request for: Approved, Closed | |
Initiation
Results Other: A01155, Forwards Nonproprietary & Proprietary Versions of Test Rept, Hydraulic Flow Test of Model C Prototype Fuel Assembly. Application & Affidavit for Withholding Encl.Proprietary Rept Withheld (Ref 10CFR2.790), A01183, Submits Info Re Justification of Measurement Uncertainty Values for Axial Shape Index,Pressure,Temp,Flow & Power,In Response to NRC 801006 Request, A01184, Submits Resolution of Cycle 4 Startup Commitments,Re Effect of Predicted Bundle Deformation on Heat Transfer from Fuel Rods During Reflooding Stage of LOCA, A01848, Advises That Licensee Will Not Propose License Amend to Tech Specs,Section 5 to Include Guide Tube Sleeving Requirements for Fuel Assemblies Located Under Control Element Assemblies.Current Fixes Adequate, B10342, Part 21 Rept Re Resistance Temp Detectors (RTD) & Associated Signal Processing Equipment Scheduled for Installation During Refueling Outage in Early 1983.Steps Taken to Ensure Reliable RTD Operation in Interim Listed, B10408, Informs of Status of Transient & Accident Analyses Review to Determine Steam Generator Operability W/Approx 1,500 Plugged Tubes.All non-LOCA & Small Break Analyses Remain Valid. Analysis of Large Break Scenario Will Be Docketed by 820212, B10425, Forwards Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes, B10427, Advises That Evaluations of Clad Collapse & Fission Gas Pressure Have Been Performed for C-E Fuel to Be Utilized During Cycle 5, B10433, Submits Addl Info Supporting 820204 Cycle 5 non-LOCA Transient Analyses Results for Addl Plugged Steam Generator Tubes,Per Request.Increasing Number of Tubes Do Not Require Tech Spec Mods, ML19350A511, ML20031C479, ML20040A520, ML20041C396, ML20042C153, ML20042C157 | |
| From | |
MONTHYEARA01183, Submits Info Re Justification of Measurement Uncertainty Values for Axial Shape Index,Pressure,Temp,Flow & Power,In Response to NRC 801006 Request1981-01-0808 January 1981
[table view]Submits Info Re Justification of Measurement Uncertainty Values for Axial Shape Index,Pressure,Temp,Flow & Power,In Response to NRC 801006 Request A01155, Forwards Nonproprietary & Proprietary Versions of Test Rept, Hydraulic Flow Test of Model C Prototype Fuel Assembly. Application & Affidavit for Withholding Encl.Proprietary Rept Withheld (Ref 10CFR2.790)1981-03-0606 March 1981 Forwards Nonproprietary & Proprietary Versions of Test Rept, Hydraulic Flow Test of Model C Prototype Fuel Assembly. Application & Affidavit for Withholding Encl.Proprietary Rept Withheld (Ref 10CFR2.790) ML19350A5111981-03-31031 March 1981 Nonproprietary Version of Hydraulic Flow Test of Model C Prototype Fuel Assembly A01184, Submits Resolution of Cycle 4 Startup Commitments,Re Effect of Predicted Bundle Deformation on Heat Transfer from Fuel Rods During Reflooding Stage of LOCA1981-06-0808 June 1981 Submits Resolution of Cycle 4 Startup Commitments,Re Effect of Predicted Bundle Deformation on Heat Transfer from Fuel Rods During Reflooding Stage of LOCA ML20005A9541981-06-22022 June 1981 Submits Physics Review of 800306 Basic Safety Rept.Rept Intended to Serve as Ref Fuel Assembly & Safety Analysis Rept.Rept Acceptable for Ref in Licensing Actions.Review Will Be Completed by 810901 A01848, Advises That Licensee Will Not Propose License Amend to Tech Specs,Section 5 to Include Guide Tube Sleeving Requirements for Fuel Assemblies Located Under Control Element Assemblies.Current Fixes Adequate1981-09-11011 September 1981 Advises That Licensee Will Not Propose License Amend to Tech Specs,Section 5 to Include Guide Tube Sleeving Requirements for Fuel Assemblies Located Under Control Element Assemblies.Current Fixes Adequate ML20031C4791981-09-28028 September 1981 Provides Info Re Guide Tube Wear Experienced in Sleeved C-E, Sleeved Westinghouse,Low Flow C-E & Inset Westinghouse Fuels,Per 801006 Commitment,In Support of Continued Operation W/Modified Guide Tubes in Cycle 5 ML20031G3521981-10-15015 October 1981 Forwards Supplementary Steam Generator Insp Program - Cycle 5 Reload,Per Amend 61 to License DPR-65 ML20031G3561981-10-31031 October 1981 Supplementary Steam Generator Insp Program - Cycle 5 Reload B10348, Application to Amend Tech Specs for License DPR-56,revising Section 3/4.9.8 Re Shutdown Cooling & Coolant Circulation During Refueling Operations to Increase Flexibility During Leak Testing1981-12-0202 December 1981 Application to Amend Tech Specs for License DPR-56,revising Section 3/4.9.8 Re Shutdown Cooling & Coolant Circulation During Refueling Operations to Increase Flexibility During Leak Testing B10342, Part 21 Rept Re Resistance Temp Detectors (RTD) & Associated Signal Processing Equipment Scheduled for Installation During Refueling Outage in Early 1983.Steps Taken to Ensure Reliable RTD Operation in Interim Listed1981-12-0808 December 1981 Part 21 Rept Re Resistance Temp Detectors (RTD) & Associated Signal Processing Equipment Scheduled for Installation During Refueling Outage in Early 1983.Steps Taken to Ensure Reliable RTD Operation in Interim Listed ML20040A3471981-12-24024 December 1981 Forwards Request for Addl Info Necessary to Complete Review of Reload Safety Analysis for Cycle 5 Operation.Info Should Be Submitted by 820111 ML20040E2041982-01-12012 January 1982 Forwards Safety Evaluation of Westinghouse Basic Safety Rept.Transient Analysis for Startup of Inactive Reactor Coolant Pump,Excess Load & Loss of Normal Feedwater Acceptable B10382, Application to Amend License DPR-65,revising Tech Spec Section 3/4.1.1 Re Shutdown Margin Required in Modes 1-41982-01-14014 January 1982 Application to Amend License DPR-65,revising Tech Spec Section 3/4.1.1 Re Shutdown Margin Required in Modes 1-4 ML20040A5201982-01-30030 January 1982 Proposed Revision to Tech Spec Section 3/4.1.1,changing Limiting Condition for Operation,Surveillance Requirements & Bases for Shutdown Margin Required in Modes 1-4 B10408, Informs of Status of Transient & Accident Analyses Review to Determine Steam Generator Operability W/Approx 1,500 Plugged Tubes.All non-LOCA & Small Break Analyses Remain Valid. Analysis of Large Break Scenario Will Be Docketed by 8202121982-02-0404 February 1982 Informs of Status of Transient & Accident Analyses Review to Determine Steam Generator Operability W/Approx 1,500 Plugged Tubes.All non-LOCA & Small Break Analyses Remain Valid. Analysis of Large Break Scenario Will Be Docketed by 820212 ML20041E1141982-02-18018 February 1982 Forwards Safety Evaluation Re Reactor Fuels & Thermal Hydraulic Sections of Basic Safety Rept (Bsr).Reactor Fuel Design & Thermohydraulic Characteristics Including Transient & Accident Analyses Addressed in Bsr Acceptable A02239, Forwards Requested Addl Info Re Response to TMI Action Item I.A.1.1., Shift Technical Advisor.Info Consists of Name,Nuclear Experience,College Courses Completed & Training for Each Nondegreed Shift Technical Advisor1982-02-19019 February 1982 Forwards Requested Addl Info Re Response to TMI Action Item I.A.1.1., Shift Technical Advisor.Info Consists of Name,Nuclear Experience,College Courses Completed & Training for Each Nondegreed Shift Technical Advisor B10425, Forwards Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes1982-02-19019 February 1982 Forwards Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes B10433, Submits Addl Info Supporting 820204 Cycle 5 non-LOCA Transient Analyses Results for Addl Plugged Steam Generator Tubes,Per Request.Increasing Number of Tubes Do Not Require Tech Spec Mods1982-02-23023 February 1982 Submits Addl Info Supporting 820204 Cycle 5 non-LOCA Transient Analyses Results for Addl Plugged Steam Generator Tubes,Per Request.Increasing Number of Tubes Do Not Require Tech Spec Mods B10427, Advises That Evaluations of Clad Collapse & Fission Gas Pressure Have Been Performed for C-E Fuel to Be Utilized During Cycle 51982-02-23023 February 1982 Advises That Evaluations of Clad Collapse & Fission Gas Pressure Have Been Performed for C-E Fuel to Be Utilized During Cycle 5 ML20041C3961982-02-28028 February 1982 Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes ML20042C1561982-03-0505 March 1982 Safety Evaluation Supporting Amend 74 to License DPR-65 ML20042C1571982-03-0505 March 1982 Notice of Issuance & Availability of Amend 74 to License DPR-65 ML20042C1531982-03-0505 March 1982 Amend 74 to License DPR-65,authorizing Cycle 5 Operation & Amending App a Tech Specs 1981-09-11 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:43380&oldid=5533414"