TAC:13148
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
| |
| From | |
MONTHYEARML19209C2771979-10-0808 October 1979
[table view]Responds to 790808 Request for Analysis of Electric Distribution Sys Voltages by 791008.Due to Large Amount of Time Required to Acquire All Power Source & Distrubition Equipment Data Necessary,Analysis Will Be Submitted 791115 ML20125B9931979-10-31031 October 1979 Voltage Drop Analysis Computations, Revision 1 ML19257A5111979-12-27027 December 1979 Submits Voltage Drop Analysis Computations in Response to NRC 790808 & 1008 Requests.Offsite Power & Onsite Distribution Sys Adequate to Start & Operate Safety Loads in Event of Anticipated Transient or Accident ML20125B9881979-12-27027 December 1979 Forwards Voltage Drop Analysis Computations, in Response to 790808 Request.Testing Methods Are Being Studied in Light of Favorable Analytical Results.Verification Method Will Be Submitted by Approx 800530 ML20049A6411981-09-16016 September 1981 Forwards Request for Addl Info & Confirms 810909 Telcon Re Verification of Instrument & Control Equipment Satisfactory Operation During 84.8% Voltage Degradation on 120-volt Ac Bus ML20049A6921981-09-23023 September 1981 Forwards Maskell 810916 Memo Re Results of 810909 Telcon Between Maskell,J Graber,P Shenoy,J Weaver & B Siegel Concerning Adequacy of Station Electric Distribution Sys Voltages for Facility 1979-12-27 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:13148&oldid=3471896"