TAC:10996
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
MONTHYEARML19329B5491977-08-30030 August 1977
[table view]Forwards Summary of Vital Analysis of Instrument Ground Sys & Relationship & Tie to Station Ground Sys,Showing Safety Sys Will Perform as Intended Under Worst Possible Electrical Fault.Oversize Drawing Encl ML19319B4921977-08-30030 August 1977 Facility & Instrument Grounding Sys, Revision 1 ML19319C4361977-09-13013 September 1977 Summary of NRC 770825 Meeting W/Util Re Instrument to Station Ground Grid Sys.Util Stated Safety Sys Will Perform Intended Function Under Worst Station Electrical Fault Condition ML19319B4891977-09-16016 September 1977 Forwards Util 770825 Safety Evaluation, Facility & Instrument Grounding Sys, Revision 1 ML19317F6381977-09-26026 September 1977 Confirms Discussion W/Util That Instrumentation Ground Grid Sys at Facility Acceptable for Power Operation in Mode 1. Conclusions Based on SER & Util Commitment to Monitor Instrumentation Sys ML19340C2941980-11-0404 November 1980 Forwards Summary & Status of DB-L Instrument Sys Analysis & Testing in Response to Commitments Set Forth in NRC Re instrument-station Groundgrid Sys.Identified Grounds Do Not Affect Plant Operation 1977-09-16 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:10996&oldid=4810806"