Pages that link to "TXX-90205"
Jump to navigation
Jump to search
The following pages link to TXX-90205:
Displayed 2 items.
- TXX-9130, Final Deficiency Rept CP-90-07 Re Safeguards Bldg Overtemp Condition.Initially Reported on 900608.Unit 1 Design Mods Incorporated Into Unit 2 Piping Insulation Spec (← links)
- TXX-9036, Interim Defeiciency Rept CP-90-07 Re Safeguards Bldg Overtemp Condition.Initially Reported on 900608.Next Rept Will Be Submitted After Completing HVAC Analyses of Main Steam Penetration Area (← links)