Pages that link to "TXX-6534, Interim Deficiency Rept CP-85-31 Re Installation of Radiant Energy Shield & Separation Barrier Matl on Conduit Raceways W/O Design Review.Initially Reported on 861205.Work 40% Complete for Supports.Next Rept Will Be Submitted by 870828"
Jump to navigation
Jump to search
The following pages link to TXX-6534, Interim Deficiency Rept CP-85-31 Re Installation of Radiant Energy Shield & Separation Barrier Matl on Conduit Raceways W/O Design Review.Initially Reported on 861205.Work 40% Complete for Supports.Next Rept Will Be Submitted by 870828:
Displayed 2 items.
- ML20216F038 (redirect page) (← links)
- TXX-6534 (redirect page) (← links)
- TXX-6689, Interim Deficiency Rept CP-85-31 Re Class 1E Electrical Raceway Support Sys.Initially Reported on 861205.Refined Engineering Analysis Indicates Addl Supports Required.Next Rept Will Be Submitted by 871016 (← links)
- TXX-6534, Interim Deficiency Rept CP-85-31 Re Installation of Radiant Energy Shield & Separation Barrier Matl on Conduit Raceways W/O Design Review.Initially Reported on 861205.Work 40% Complete for Supports.Next Rept Will Be Submitted by 870828 (← links)