Pages that link to "Swart R"
← Swart R
Jump to navigation
Jump to search
The following pages link to Swart R:
Displayed 4 items.
- 05000254/LER-1992-030-01, :on 921213,reactor Recirculation Pump 1B Tripped Due to Inadequate Relay Logic Blocks Associated W/ Temporary Procedure.Caused by Inadequate Communications.Test Suspended & Procedure Will Be Revised (← links)
- 05000254/LER-1992-011-03, :on 920530,Unit 1 in Shutdown Mode Performing Cooldown to Cold Condition for Maint Outage.Caused by Procedural Inadequacy.Cooldown Rate Minimized & Thermocouple Replaced (← links)
- 05000265/LER-1991-008-04, :on 910723,outboard Recirculation Sample Valve AO-2-220-45 Closed W/No Apparent Signal.Caused by Defective Connections in Control Circuitry.Corrective Actions Included Fuse Verfication & Insp of All Terminations (← links)
- 05000254/LER-1990-030, :on 901108,ABB Impell Corp Informed Util That Reactor Recirculation Piping Potentially Ouside Seismic Design Basis.Caused by Design Discrepancy During Seismic Modeling.Whip Restraints Modified (← links)