Pages that link to "SR-3.6.5.1.4"
Jump to navigation
Jump to search
The following pages link to SR-3.6.5.1.4:
Displayed 25 items.
- RS-10-008, Clinton Power Station, Unit 1, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, (← links)
- ML18284A370 (← links)
- RS-10-093, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (← links)
- RS-10-008, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) (← links)
- RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) (← links)
- RBG-47775, Revisions to the Technical Requirements Manual and the Technical Specification Bases (← links)
- RBG-47620, License Amendment Request for Change to Technical Specification; 5.5.13, to Be Extended to 15 Years, Drywell Bypass Test Frequency to 15 Years and Type C Test Frequency to 75 Months (← links)
- RBG-47006, Revisions to the Technical Requirements Manual and the Technical Specification Bases (← links)
- L-14-106, License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b (← links)
- U-604454, Transmittal of Revision 20 to Technical Specification Bases (← links)
- U-604075, Transmittal of Revision 14 to the Technical Specification Bases (← links)
- RBG-46419, Revisions to the Technical Requirements Manual and the Technical Specifications Bases (← links)
- ML043200567 (← links)
- RBG-46314, Supplement to Amendment Request for a One Time Extension of the Drywell Bypass Test, Response to Request for Additional Information 2, River Bend Station, Unit 1 (← links)
- RBG-45935, Part B - Revisions 58 -76 to River Bend Station Technical Requirements Manual & Technical Specification Bases (← links)
- ML20084L500 (← links)
- ML20096D465 (← links)
- ML20094M800 (← links)
- ML20116J315 (← links)
- ML20212C695 (← links)
- ML20216H936 (← links)
- U-602596, Provides Addl Info for Amend to Incorporate Proposed Change to CPS Ts, ,be Reviewed on Schedule Sufficient to Support Sixth Refueling Outage Currently Scheduled to Begin 961013 (← links)
- RS-20-028, 1 to Updated Safety Analysis Report, CPS Tsb (← links)
- U-602549, Application for Amend to License NPF-62,proposing to Revise TS 3.6.5.1, Drywell, to Allow Drywell Bypass Leakage Tests to Be Performed at Intervals of Up to Ten Yrs Based on Demonstrated Performance of Drywell Barrier (← links)
- ML23303A136 (← links)