Pages that link to "SECY-97-051"
Jump to navigation
Jump to search
The following pages link to SECY-97-051:
Displayed 50 items.
- ML20137X068 (← links)
- ML20137F694 (← links)
- ML20136D464 (← links)
- ML20138P444 (← links)
- ML20138H397 (← links)
- ML20199B440 (← links)
- ML20198K291 (← links)
- ML20206N148 (← links)
- ML20211G268 (← links)
- NSD-NRC-97-5231, Forwards Formal Transmittal of Correspondence Previously Sent Over Period 970515-970605.W/index (← links)
- NSD-NRC-97-5153, Forwards Formal Transmittal of Correspondence Previously Sent Informally Over Period of 970423-0512 (← links)
- NSD-NRC-97-5101, Forwards Discussion of GDC-2 Design Bases Westinghouse Has Adopted as Appropriate for Equipment Added to AP600 Design. Conclusion Re GDC-2 Design,Requested by 970516 in Order to Ensure Milestone in SECY-97-051 (← links)
- NSD-NRC-97-5033, Submits Formal Transmittal of Correspondence Previously Sent Informally Covering Period 970205-0316.Index of Encl Matl Attached (← links)
- NSD-NRC-97-5130, Forwards Revised AP600 Tech Spec 3.7.6 Re Main Control Room Habitability Sys.Markup of Ssar Page 3.9-168 Note 8 Also Included to Incorporate Pressure & Flow Rate of SR 3.7.6.9 (← links)
- NSD-NRC-97-5131, Forwards Formal Transmittal of Correspondence Previously Sent Informally Sent Over Period of 970314-0411,including Resolution of Open Items 472 & 1172 from Rev 12 to Ssar (← links)
- NSD-NRC-97-5137, Forwards Formal Transmittal of Correspondence Previously Sent Informally Over Period of 970416-30,including Info Re Ssar Open Items 292,277,300 & 304 (← links)
- NSD-NRC-97-5133, Forwards Formal Transmittal of Correspondence Previously Sent Informally Over Period 970416-0502,including Draft of Ssar Markup for LOOP Issue & Open Item Status (← links)
- NSD-NRC-97-5148, Forwards Formal Transmittal of Correspondence Previously Sent Informally Over Period of 970508-0514 (← links)
- NSD-NRC-97-5076, Forwards AP600 TS LCO 3.0.2 & 3.0.3,reflecting Compliance W/Nrc Staff Position of Ltr (← links)
- NSD-NRC-97-5174, Forwards Responses to 970514 RAI Re Containment Systems & Severe Accident Branch Relating to AP600 Initial Test Program (← links)
- NSD-NRC-97-5176, Forwards AP600 Tech Specs,Ssar Section 16.1,marked Up to Reflect Resolution of NRC Comments Received (← links)
- NSD-NRC-97-5100, Forwards Three Copies of Responses to RAI Re Automatic ADS Testing Performed in Support of AP600 Design,Provided to Close Open Items 27,500,1616 & 3397 in Oits.Provide Comments by 970516 to Meet Milestone in SECY-97-051 (← links)
- NSD-NRC-97-5096, Forwards Three Copies of Response to Open Item Re AP600, DSER-CN 21.6.2.4-4.Comments Should Be Provided by 970516 to Meet Milestone Set in SECY-97-051 to Provide Final AP600 Supporting Documentation by 970530 (← links)
- NSD-NRC-97-5099, Forwards Response to NRC RAI on Preoperational Testing of AP600 Passive Safety Sys During Initial Test Programs & Proposes Two Addl Tests.Provide Comments by 970516 in Order to Meet Milestone in SECY-97-051 (← links)
- NSD-NRC-97-5098, Forwards Response to 970423 RAI Re AP600 ADS Valves.Comments Requested by 970516 (← links)
- NSD-NRC-97-5062, Forwards Rev 0 to WCAP-14837, AP600 Shutdown Evaluation Rept, Which Provides Evaluation Consistent W/Outline Defined in for Inclusion in Ssar (← links)
- NSD-NRC-97-5087, Consolidates Responses & Resolutions of Items Associated W/Ssar Section 9.4.Completion of Submittal of Final Documentation Related to Ssar Section 9.4 for Application for AP600 Design Certification,Confirmed (← links)
- NSD-NRC-97-5085, Submits Westinghouse Responses to NRC Questions & Comments Re AP600 Ts,For Ssar (← links)
- NSD-NRC-97-5064, Consolidates Responses & Resolutions of Items Associated W/ Ssar Section 3.8.2 & Confirms Completion of Submittal of Final Documentation Related to Ssar Section 3.8.2 for Application for AP600 Design Certification (← links)
- NSD-NRC-97-5065, Confirms Completion of Submittal of Final Documentation Re Ssar,Section 3.6.2, Determination of Break Locations & Dynamic Effects Associated W/Postulated Rupture of Piping, for AP600 Design Certification (← links)
- NSD-NRC-97-5057, Forwards Results of Offsite & Main Control Room Dose Analysis Considering AP600 SFP Boiling (← links)
- NSD-NRC-97-5059, Forwards Responses to Listed Initial Comments on AP600 Revised Ts,Dtd 961224,as Completion of Open Item Tracking Sys Item 4970 (← links)
- NSD-NRC-97-5031, Forwards Formal Transmittal of mark-up Ssar Sections Open Items & Draft Responses to NRC Questions Previously Submitted Informerly (← links)
- NSD-NRC-97-5039, Consolidates Responses & Resolutions of Items Associated W/Ssar Section 3.10.Completion of Submittal of Final Documentation Re Ssar Section 3.10 for Application for AP600 Design Certification Confirmed (← links)
- NSD-NRC-97-5038, Confirms Completion of Submittal of Final Documentation Re Ssar Section 6.1 for Application for AP600 Design Certification (← links)
- NSD-NRC-97-5037, Confirms Completion of Submittal of Final Documentation Re Ssar Chapter 13 for Application for AP600 Design Certification (← links)
- NSD-NRC-97-5036, Confirms Completion of Submittal of Final Documentation Re PRA Chapter 42,conditional Containment Failure Probability Distribution for Application for AP600 Design Certification (← links)
- NSD-NRC-97-5048, Confirms Completion of Submittal of Final Documentation Re Ssar,Section 3.2,Classification of Structures,Components & Systems,For Application for AP600 Design Certification (← links)
- NSD-NRC-97-5047, Consolidates Responses & Resolutions of Items Associated W/Ssar Chapter 7 for Application for AP600 Design Certification (← links)
- NSD-NRC-97-5053, Confirms Completion of Submittal of Final Documentation Related to Ssar,Chapter 17,Quality Assurance,For Application for AP600 Design Certification (← links)
- NSD-NRC-97-5052, Confirms Completion of Submittal of Final Documentation Re Ssar,Chapter 8,Electrical Power,For Application for AP600 Design Certification (← links)
- NSD-NRC-97-5054, Confirms Completion of Submittal of Final Documentation Re Ssar,Chapter 13,Conduct of Operation,For Application for AP600 Design Certification (← links)
- NSD-NRC-97-5051, Confirms Completion of Submittal of Final Documentation Re Ssar,Section 6.5,Fission Product Removal & Control Sys for Application for AP600 Design Certification (← links)
- NSD-NRC-97-5050, Confirms Completion of Submittal of Final Documentation Re Ssar,Section 6.1,ESF Matls for Application for AP600 Design Certification (← links)
- NSD-NRC-97-5049, Consolidates Responses & Resolutions of Items Associated W/ Ssar Chapter 18 to Confirm Completion of Submittal of Final Documentation Re Ssar Chapter 18 of Application for AP600 Design Certification (← links)
- NSD-NRC-97-5042, Confirms Completion of Submittal of Final Documentation Re Ssar,Section 6.6,ISI of Class 2 & 3 Components for Application for AP600 Design Certification (← links)
- NSD-NRC-97-5029, Forwards Response to NRC Re TS Comments (← links)
- NSD-NRC-97-5024, Provides W Responses to Items Discussed in NRC Ltr .Attachment Includes Dates for Completion of Certain Analytical Activities Re AP600 Design Changes Addressing Post 72 H Actions.Nrc Comments Requested by 970331 (← links)
- NSD-NRC-97-5030, Submits Revised Response & Markup of LCOs 3.0.2 & 3.0.3 & Bases for NRC Review.Rev Deletes Exemption for Entry Into LCO 3.0.3 (← links)
- NSD-NRC-97-5014, Forwards Draft Seismic Margin Analysis (PRA Chapter 55) & Responses to Requests for Addl Info.Nrc Expected to Review Draft PRA Chapter 55 & Responses Provided in Encl 2 Preparation for Meeting Between Westinghouse & NRC (← links)