Pages that link to "PNO-III-88-007"
Jump to navigation
Jump to search
The following pages link to PNO-III-88-007:
Displayed 2 items.
- PNO-III-88-007, on 880206,300 Lbs of Calciner U3O8 Spilled Onto Concrete Pad as Result of Seal Leak from Calciner.Spill Occurred While Plant in Shutdown Mode for Weekend.Matl Cleaned Up within 45 Minutes of Discovery (← links)
- PNO-III-88-087, on 881025,licensee Determined That Neither of Two motor-driven Auxiliary Feedwater Pumps Would Automatically Start W/Loss of Offsite Power & lo-lo Steam Generator Level.Pumps Declared Inoperable (← links)