Pages that link to "NRC Form MSA"
Jump to navigation
Jump to search
The following pages link to NRC Form MSA:
Displayed 11 items.
- 05000423/LER-1987-037-01, :on 871101,feedwater Isolation Occurred Due to High Steam Generator Level.Caused by Operator Error.Steam Generator Level Allowed to Decrease to Normal Operating Range.Feedwater Reset & Placed in Svc (← links)
- 05000259/LER-1987-007-01, :on 870409,following Calibr & Functional Test of Control Room Air Inlet Radiation Monitor,Erratic Count Observed & Subsequent Spike.Caused by Broken Terminal Lug. Connector Rewired & Replaced (← links)
- 05000325/LER-1986-033, :on 861104,during Development of PRA Model, Diesel Generator Bldg Ventilation Design Deficiency Identified.Caused by Failed Close Design of Supply Dampers. Supply Plenum Damper Linkages Wired Open (← links)
- 05000317/LER-1997-006, :on 970722,cable Spreading Room Halon Sys Was Inoperable.Caused by Personnel Error.Operations Personnel Reminded of Possibility of Inoperable Dampers Affecting Halon Sys Operability (← links)
- 05000285/LER-1997-015, :on 971017,unanalyzed Condition for Station Batteries Was Noted.Caused by Lack of Detailed Plant Design to Provide Supporting Info Re Requirement.Issued Operations Memo (← links)
- 05000395/LER-1987-030, :on 871229,fire Watch Not Established for Partially Open Fire Door.Caused by Personnel Error.Auxiliary Operator Involved Attended 880106 Mgt Review Board Meeting Re Incident & Will Brief Each Shift (← links)
- 05000338/LER-1994-001-02, :on 940122,EDG Fuel Oil Transfer Pumps Declared Inoperable Due to Improper Greasing of Pump Motor Bearings.Fuel Oil Pump House Exhaust Fans Secured & Portable Heaters Installed (← links)
- 05000382/LER-1989-021, :on 891116,emergency Diesel Generator a Declared Inoperable When Essential Svcs Chiller a Declared Inoperable W/O Verifying Availability of Offsite Ac Power. Caused by Personnel Error.Supervisor Counseled (← links)
- 05000498/LER-1989-023-01, :on 891216,standby Diesel Generator 11 Failed Tech Spec Required Operability Test & Attempt to Secure Essential Chiller 12C Resulted in Trip.Caused by Failure of Voltage Regulator.Regulator Returned to Mfg (← links)
- 05000530/LER-1997-002-01, :on 970531,RT Occurred.Caused by Spurious Opening of All Four RT Switchgear Breakers.Independent Investigation of Event Being Conducted in Accordance W/Util Corrective Action Program (← links)
- 05000397/LER-2013-004, Regarding Jumper Makes Suppression Pool Spray Valve Remote Transfer Switch Inoperable (← links)