Pages that link to "NRC Form 3e44"
Jump to navigation
Jump to search
The following pages link to NRC Form 3e44:
Displayed 9 items.
- 05000318/LER-1989-005-01, :on 890323,discovered That Snubber Functional Test Procedure to Satisfy Tech Specs 4.7.8.1.c & D Not Adequate.Caused by Lack of Adequate Control for Procedures. Rev Proposed to Facility Instruction CCI-104 (← links)
- 05000338/LER-1986-017-01, :on 860910,single Train ECCS Actuation from lo- Lo Pressurizer Pressure Signal Occurred.Caused by Personnel Error During Performance of Solid State Protection Sys Test. Evaluation Continuing (← links)
- 05000302/LER-1986-025, :on 861214,discovered That Three Breakers Tying Facility Into 230 Kv Switchyard Lacked Independent Power Sources.Caused by Personnel Error.Wiring Changed & Portion of Electrical Design Section of FSAR Revised (← links)
- 05000255/LER-1986-024, :on 860804,during Cold Shutdown,Discovered Insufficient Svc Water Flow Through Containment Air Coolers. Caused by Improper Adjustment of Valve Actuators.Actuators Adjusted to Facilitate Proper Operation (← links)
- 05000327/LER-1988-036-01, :on 881004,reactor Trip Signal Occurred,Caused by Steam Flow to Feedwater Flow Mismatch of Greater than 40% Coincident W/Low Steam Generator Signal Present.Reactor Protection Sys/Esf Calibr Procedure Revised (← links)
- 05000369/LER-1984-011-01, :on 840329,diesel Generator 1A Experienced Invalid Automatic Start.Caused by Shorted Diode in Temporary Trip Monitoring Device.Device Will Be Modified (← links)
- 05000280/LER-1984-007-06, :on 840328,instrument Technicians Determined That Main Feed Regulating Valves Would Not Have Tripped Closed Upon Receipt of Feedwater Isolation Signal.Caused by Unapproved Work Procedure.Procedure Corrected (← links)
- 05000263/LER-1984-003, :on 840109,while Performing HPCI High Steam Flow Sensor Test & Calibr,Time Delayed High Steam Flow Isolation Signal Exceeded Tech Spec Limit.Probably Caused by Foreign Matl Between Diaphragm Exhaust (← links)
- 05000277/LER-1991-020, :on 910607,two Diesel Generators Discovered Inoperable Due to Mispositioned Valve.Caused by Personnel Error.Valve Immediately Restored & Involved Operator & Chemist Counseled (← links)