- 05000251/LER-1989-007-01, :on 890713,determined That Required Visual Exam for Leakage Missed.Caused by Cognizant Field Engineer Personnel Error.Visual Exam Performed within 1 Hr.No Leakage Detected.Personnel Counseled (← links)
- 05000250/LER-1989-009, :on 890519,design Inadequacy in App R Safe Shutdown Analysis Identified by Util Engineers.Caused by Design Inadequacy.Fire Watches Established for Unit 4 & Will Be Established for Unit 3 (← links)
- 05000315/LER-1989-015-01, :on 891128,pyralarm Fire Detection Zone 3 Made Inoperable When Welding in Laundry Room Caused Standing Alarm.Fire Watch Patrol Not Assigned within 1 H.Caused by Personnel Error.Event Reviewed W/Operators (← links)
- 05000316/LER-1989-012, :on 890624,monthly Channel Checks Required by Tech Spec 3.3.3.6,Table 3.3-10 for Containment Water Level Instruments Not Included in Surveillance Procedure.Caused by Personnel Error.Procedure Revised on 890624 (← links)
- 05000315/LER-1988-007-01, :on 880908,flow Passage Insp of Ice Condenser Revealed Frost & Ice Buildup.Caused by Sublimation of Ice or High Humidity in Containment Air.Flow Passages Manually Cleaned to Remove Accessible Frost (← links)
- 05000397/LER-1988-017, :on 880615,problems W/Limitorque Models SMB-000 & SMB-00 Discovered W/Potential Defective Switches.Caused by Design Problem.Investigation & Evaluation of Switch Problems Immediately Initiated.Part 21 Related (← links)
- 05000397/LER-1988-007, :on 880214,rupture of Reactor Bldg Roof Occurred Due to HVAC Overpressurization Transient.Caused by Personnel Error.Equipment Operator Training Program & Investigative Process Being Developed (← links)
- 05000397/LER-1987-022, :on 870706,reactor Scrammed on Low Reactor Water Level Due to Loss of Single Operating Reactor Feedwater (Turbine) Pump.Caused by Inadequate Procedures. Procedures Revised & Training Will Be Provided (← links)