Pages that link to "NRC Form 3GSA"
Jump to navigation
Jump to search
The following pages link to NRC Form 3GSA:
Displayed 18 items.
- ML20206E476 (← links)
- 05000259/LER-1998-001-03, :on 980414,standby Gas Treatment Sys HEPA Filter Testing Was Not in Compliance W/Ansi Std Requirements.Caused by Lack of Understanding of DOP Testing. Filter Testing Training Will Be Provided (← links)
- 05000219/LER-1998-001-01, :on 980216,core Spray/Automatic Depressurization Sys Contacts Were Not Tested by Procedure. Caused by Inadequate Testing Procedures.Required Contact Verifications & Testing Was Completed (← links)
- 05000414/LER-1986-051-01, :on 861120,reactor Tripped on Turbine Trip Above 69% Reactor Power.Caused by Feedwater Pump Suction Flow Pressure Switch Being Out of Calibr.Work Request Initiated & Completed on Pressure Switch (← links)
- 05000334/LER-1999-007, :on 990413,manually Initiated Reactor Trip Signal During pre-planned Shutdown of Unit While in Mode 3. Caused by Failure of Cabinet Air Conditioner.Replaced Failed Cabinet Air Conditioner.With (← links)
- 05000388/LER-1986-006-01, :on 860413,inboard Containment Isolation Valve Closed & RWCU Pumps Tripped.Caused by Isolation of RWCU During High Differential Flow as RWCU Filter/Demineralizer Being Returned to Svc.No Action Planned (← links)
- 05000282/LER-1997-007-01, :on 970429,declared Both Trains of Spent Fuel Pool Special Ventilation Inoperable Due to Handling Load Over Spent Fuel.Deleted TS Interpretation 3.8-3 & Returned Ventilation Sys to Service When Door Was Shut (← links)
- 05000382/LER-1997-012, :on 970404,programmatic Breakdown of Overtime Program Occurred.Caused by Lack of Mgt Oversight in Administering & Implementing Plants Working Hour Policy. Ltr Issued Reemphasizing Working Hour Policy (← links)
- 05000260/LER-1997-001-05, :on 970424,reactor Scram Occurred During Surveillance Testing.Caused by Personnel Error.Affected Sys Were Restored to pre-event Conditions,Administered Personnel Corrective Actions & Briefed Maintenance (← links)
- 05000245/LER-1996-063, :on 961126,discovered Downscale Trip Fuctions for Steam Tunnel Vent Radiation Monitors Did Not Trip as Required by Design.Caused by Procedural Deficiency.Procedure for Steam Tunnel Vent Monitors Changed (← links)
- 05000364/LER-1996-003-01, :on 961030,determined That More than 1% of Inservice Tubes in Each SG During Eleventh Cycle Found Defective.Caused by Roll Transition Degradation,Sludge Zone Degradation & Free Span Degradation (← links)
- 05000333/LER-1996-001-01, :on 960125,failed to Implement RM Instrumentation Setpoint Changes Following Revision to Odcm. Caused by Personnel Error.Rm Alarm Setpoints Verified & Personnel Counseled (← links)
- 05000338/LER-1984-004-01, :on 840501,preliminary Results of Fire Protection Program Indicated Inadequacies in Six Categories, Including Separation,Fire Dampers,Fire Doors,Fire Suppression & Emergency Lighting (← links)
- 05000293/LER-1995-006, :on 950614,RCIC Sys Made Inoperable for Troubleshooting Problem W/Turbine Steam Supply Valve.Caused by Either Loosened wire-connector or Failed Auxiliary seal- in Relay.Relay Replaced & Wires Checked (← links)
- 05000317/LER-1994-004, :on 940221,discovered Excessive Corrosion of Incore Instrumentation Flange Components Due to Presence of Wet Boric Acid.Boric Acid Corrosion Insp Program Will Be Revised (← links)
- 05000278/LER-1994-002-01, :on 940203,discovered Main Generator Ground Relay Status Light Out.Caused by Internal Rack Out Tab Not Installed on Alterex Field Breaker.Damaged Component Repaired & Breaker Replaced W/Spare (← links)
- 05000331/LER-1994-001, :on 940107,determined That Test of APRM High Flux Scram Trip Setpoint Inadequate Due to Lack of Awareness.Surveillance Test Procedure for Testing Flow Biased APRM Scram Trip Setpoint Revised (← links)
- 05000302/LER-1989-037, :on 891026,determined That Instrumentation Used to Balance HPI Flow Through Four Injection Lines During Small Break LOCA Inadequate.Caused by Inadequate Review of B&W Guidelines.Flow Instrument Installed (← links)