Pages that link to "NRC Form 326A"
Jump to navigation
Jump to search
The following pages link to NRC Form 326A:
Displaying 16 items.
- 05000331/LER-1998-004, :on 980502,noted That Five of Eight Valves Failed to Meet Setpoint Requirements.Caused by Inadequate Corrective Actions.Replaced MSRVs Pilots & MSSVs W/Valves That Were Previously Set Pressure Tested (← links)
- 05000298/LER-1998-004, :on 980311,average Range Power Monitors Not Tested.Caused by Failure to Effectively Implement TS Amend. Procedure Will Be Revised by 980602,prior to Next Startup, Whichever Comes First (← links)
- 05000354/LER-1999-007-01, :on 990614,license Condition Violation - Class 1E Battery Charging Operation Was Noted.Caused by Inadequate Procedure Development.Procedures Revised & Personnel Held Accountable for Inappropriate Actions (← links)
- 05000333/LER-1999-005-01, :on 990506,missed Surveillance Test Was Noted. Caused by Inoperable Containment Hydrogen/Oxygen Analyzer. Counseled Personnel Involved & Revised Procedures.With (← links)
- 05000412/LER-1999-002-01, :on 990305,discovered Potential Damage to Charging HHSI Pumps Due to Inadequate pre-fire Plan Procedure Guidance.Caused by Inadequate Analysis in 1987. Procedures Revised Addressing Subj Issue.With (← links)
- 05000289/LER-1997-007, :on 970621,generator Output Breaker Failed Resulting in Loss of Offsite Power & Rt.Caused by Failure of Generator Breaker GB-102.Both Failed Breakers Were Replaced (← links)
- 05000461/LER-1997-013, :on 970508,failure to Adequately Verify That No Trips Existed During Surveillance Test Resulted in Inadvertent Actuation of Sgts.Caused by Personnel Error. Procedure CPS 9532.61 Was Revised (← links)
- 05000245/LER-1997-004-02, :on 970127,RBCCW Containment Isolation Sys Single Failure Vulnerability Occurred.Caused by Failure to Adequately Establish Design Basis.No Immediate CA Are Required (← links)
- 05000423/LER-1996-041-01, :on 961024,bypass Flow Around Swp Discharge Strainers Resulted in ECCS & ESF Sys Potentially Inoperable Following Postulated LOCA Due to Potential for Loss of Coolant.Replaced Swp Discharge Strainers (← links)
- 05000245/LER-1996-060, :on 960408,EDG Air Start Check Valve Internals Were Removed W/O Proper Documentation.Caused by Failure to Document Design Mod.Internals Have Been Reinstalled in Check Valves & Sys Has Been Restored to Original Configuration (← links)
- 05000219/LER-1996-007, :on 960904,reactor Scrammed During Condenser Backwashing Due to Low Vacuum.Reactor Was Placed in Cold Shutdown Mode Immediately (← links)
- 05000423/LER-1996-013-02, :on 960515,determined Design Deficiency in Residual Heat Removal System (Rhs).Caused by Original Plant Design.Corrective Actions Will Be Described in Supplement (← links)
- 05000454/LER-1996-003-10, :on 960417,identified Defective Tubes.Cause Undetermined.Removed Defective Tubes Either by Plugging or Sleeving (← links)
- 05000336/LER-1996-001, :on 960625,discovered Reactor Coolant Sys Heatup Rate Exceeded Tech Spec.Caused by Design & Procedural Weaknesses Re Plant Heatup Controls.Revised Plant Operating Procedures & Heatup/Cooldown Computer Program (← links)
- 05000458/LER-1996-011, :on 960516,personnel Error Resulted in Missed Surveillance & Dry Floor Drain Sump Leakage Detection Monitoring Instrumentation Exceeded TS Allowed Outage Times. Appropriate Disciplinary Actions Taken (← links)
- 05000324/LER-1995-003-02, :on 951004,RHR Pump Was Inoperable Due to Inadequate 4KV Breaker Engagement.Counseled Involved Individual (← links)