Pages that link to "L 61727"
← L 61727
Jump to navigation
Jump to search
The following pages link to L 61727:
Displayed 16 items.
- U-604237, Post-Outage 90-Day Inservice Inspection (ISI) Summary Report (← links)
- ML20046A030 (← links)
- ML20063B641 (← links)
- ML20095E542 (← links)
- U-602994, Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable (← links)
- ML20211C962 (← links)
- U-603032, Application for Amend to License NPF-62,adding TS LCO 3.6.1.9, FW LCS (FWLCS) for Implementation of FWLCS Mode of RHR Sys (← links)
- U-602045, Forwards Response to GL 92-04, Resolution of Issues Re Reactor Vessel Water Level in BWRs Per 10CFR50.54(f). Util Endorses BWR Owners Group Plan,Including Analysis & Testing Program (← links)
- U-602028, Semiannual Radioactive Effluent Release Rept,Jan-June 1992 Clinton Power Station (← links)
- U-601999, Forwards Inservice Insp Summary Rept,Refueling Outage RF-3, Clinton Power Station (← links)
- U-602003, Notifies NRC That Ma Kiel No Longer Has Need for Operating License & License Should Be Terminated (← links)
- U-601926, Provides Addl Info on 910311 Response to Generic Ltr 89-10, Suppl 3 Re as-left Torque Switch Settings Exceeding Actuator Published Ratings (← links)
- U-602483, Responds to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity (← links)
- U-601858, Application for Amend to License NPF-62,changing Tech Specs 6.2.3.2, Composition, Subsection 6.2.3, Independent Safety Engineering Group to Provide Second Set of Acceptable Qualifications,Per NUREG-0737 (← links)
- JSP-108-94, Responds to NRC Ltr Re Violation Noted in Insp Rept 50-461/93-26.Corrective Actions:Strengthened Mgt Oversight & Lowered Threshold for Initiating Condition Reports (← links)
- U-602187, Provides Notification That Licensed Operator Initial & Continuing Training Programs re-accredited by INPO Natl Academy Training on 930825 (← links)