Pages that link to "3F0496-04"
Jump to navigation
Jump to search
The following pages link to 3F0496-04:
Displayed 7 items.
- ML20116N361 (← links)
- 3F0598-08, Forwards Rev 0 to AES98033350-1-1, Operational Assessment SG Tube Degradation at Crystal River Unit 3. Results of Assessment Provide Reasonable Assurance That OTSG Tube Integrity Will Be Maintained During Current Operating Cycle (← links)
- 3F1097-21, Application for LAR 221,Rev 0 to License DPR-72,adding Methodology to Monitor Indication Growth in Group of Tubes within Crystal River Unit 3 B Otsg.Ts Pages,Encl (← links)
- 3F0199-04, LAR 243,Rev 0 to License DPR-72,requesting one-time Rev of ITS to Extend Insp Interval for OTSG Tubes to Coincide with Planned Operating Cycle.Rev 0 to Calculation M-99-0017 & Rev 0 to Calculation AES-C-3543-1 Encl (← links)
- 3F0496-23, Provides Addl Info & Commitments on TS Change Request 203, Rev 2 Re Dispositioning Strategy for Dealing W/Iga in First Span of OTSGs (← links)
- 3F0496-18, Forwards Summary of Statistical Analysis Re non-leakage Under Steam Line Break Conditions Based on in-situ Pressure Testing Performed on Facility SG Tubes During Current Refuel Outage 10,related to TS Change Request 203 (← links)
- 3F0496-04, Submits Notifications to NRC Prior to Plant Ascension Into Mode 4 Re Number of Tubes Plugged & sleeved,crack-like Indications in First Span & Assessment of Growth for First Span Iga Indications (← links)