Pages that link to "1R25-5057-CB12"
Jump to navigation
Jump to search
The following pages link to 1R25-5057-CB12:
Displayed 4 items.
- NUREG-0887, Forwards Approved Changes to Tech Specs for Full Power License,Per 860618,0718 & 30 Requests.Certification That Changes Consistent W/Fsar,Ser & as-built Plant Requested by 860908 (← links)
- PY-CEI-NRR-0549, Proposed Tech Specs,Increasing Number of Instruments Used to Determine Drywell Average Air Temp,Deleting Requirement to Specificially Include Organizational Charts in Tech Specs & Correcting Listing of Breaker as OR25-S153-CB13 (← links)
- PY-CEI-NRR-0469, Forwards List of Tech Spec Changes to Accompany Full Power Ol,Representing Minor Editorial Corrections,Clarifications & Enhancements.Justifications & Proposed marked-up Tech Spec Pages Also Encl (← links)
- PY-CEI-NRR-1474, Proposed Tech Specs Relocating Component Lists from Sections 3.6.4 & 3.8.4.1 of Pnpp Unit 1 TS Per Generic Ltr 91-08, Removal of Component Lists from Ts (← links)