Pages that link to "05000414/LER-1998-003, Forwards LER 98-003-00,re Violation of TS 2.2.1.Commitments Made within Ltr Are Contained in Planned Corrective Actions Section of Rept"
Jump to navigation
Jump to search
The following pages link to 05000414/LER-1998-003, Forwards LER 98-003-00,re Violation of TS 2.2.1.Commitments Made within Ltr Are Contained in Planned Corrective Actions Section of Rept:
Displayed 22 items.
- 05000414/LER-1998-004, Forwards LER 98-004-00 Re de-energization of Vital Bus & Actuation of LTOP Caused by Error During Tagout.Commitments Are Contained in Planned Corrective Actions Section of LER (← links)
- 05000414/LER-1998-006, Forwards LER 98-006-00 Re Rod Control Sys Malfunction Due to Failed Card Leading to Manual Reactor Trip.Commitments Are Provided in Planned Corrective Action Section of LER (← links)
- 05000413/LER-1998-016, Forwards LER 98-016-00 Re Plant Being in Condition Outside Design Basis Due to Discovery of Missing Interlock.One Regulatory Commitment Is Contained in Planned Corrective Actions Section of LER (← links)
- 05000413/LER-1998-019, Forwards LER 98-019-00 Re Inoperable Standby Shutdown Facility in Excess of TS AOT Due to Mispositioned Breakers. One Regulatory Commitment Is Contained in Planned Corrective Actions Section of Rept (← links)
- 05000414/LER-1998-005, Forwards LER 98-005-01 Re Violation of Tech Spec 3.6.5.3,due to Inoperability of Condenser Inlet Doors,Caused by Ice/ Frost Buildup Restricting Door Movement.Ler Has Been Revised to Perform More Limited Direct Visual Insp (← links)
- 05000414/LER-1998-007, Forwards LER 98-007-00,re Inoperability of Overtemperature & Overpower Delta Temp Functions.Commitments Are Provided in Planned Corrective Action Section of Attached Rept (← links)
- 05000413/LER-1998-014, Forwards LER 98-014-00 Concerning Misinterpretation of TSs Resulting in Failure to Perform DG Surveillance Requirement within Required Surveillance Interval (← links)
- 05000413/LER-1998-015, Forwards LER 98-015-00 Re TS Required Shutdown & Operation Prohibited by TS Associated W/Ice Condenser.Rept Will Be Revised by 981015 (← links)
- 05000413/LER-1998-013, Forwards LER 98-013-01 Re Operation Outside of Tech Specs Due to Analyzing Grab Samples at Incorrect Lower of Detection.Two Regulatory Commitments Contained in Planned Corrective Actions Section of Rept (← links)
- 05000413/LER-1998-009, Forwards LER 98-009-00,concerning Unit Entering TS 3.0.3 Due to Inadequate Testing of Auxiliary Bldg Filtered Exhaust Sys (← links)
- 05000413/LER-1998-011, Forwards LER 98-011-00 Re Two Inoperable Refueling Water Storage Tank Level Channels on Each Unit Due to Lightning Activity.Commitments Made by Util Are Contained in Planned Corrective Action Section of LER (← links)
- ML20237B441 (← links)
- ML20237B119 (redirect page) (← links)
- 05000414/LER-1998-003 (redirect page) (← links)
- 05000413/LER-1998-006, Forwards LER 98-006-00,re Missed TS Surveillance on Pressurizer Heater Emergency Power Supply Testing. Commitments Made within Ltr,Encl (← links)
- 05000413/LER-1998-005, Forwards LER 98-005-00,re Missed TS Surveillance on Abv. Commitments Made within Ltr,Encl (← links)
- 05000413/LER-1998-002, Forwards LER 98-002-00,incorrectly Set Valve Leads to Elevated Condensate Storage Sys Temperature,Causing Condition Outside Design Basis of Plant.Planned Corrective Actions Section of Rept Contain Commitments (← links)
- 05000414/LER-1998-002, Forwards LER 98-002-01 Re Violation of Auxiliary Bldg Filtered Exhaust Ventilation Sys Tech Specs 3.7.7 Due to Exceeding Allowable Outage Time of TS Action Requirements for 2A Auxiliary Bldg Filtered Exhaust Sys (← links)
- 05000413/LER-1998-012, Forwards LER 98-012-00 Re Entry Into TS 3.0.3 Due to Inoperability of Both Trains of CR Ventilation Caused by Improper Sys Isolation (← links)
- 05000413/LER-1998-010, Forwards LER 98-010-00,re Pinhole Leak in AFW Nozzle Tempering Line.Commitments Are Contained in Planned Corrective Action Section of Rept (← links)
- 05000413/LER-1998-007, Forwards LER 98-007-00,concerning Missed TS Surveillance on Containment Penetration Testing Due to Literal Compliance Issue (← links)
- 05000413/LER-1998-001, Forwards LER 98-001-00 Re Both Trains of Control Room Area Ventilation Inadvertently Disabled During Restoration.Ltr Contains Commitments to Perform Corrective Actions (← links)