Pages that link to "05000348/LER-1979-063, Forwards LER 79-063/03L-0"
Jump to navigation
Jump to search
The following pages link to 05000348/LER-1979-063, Forwards LER 79-063/03L-0:
Displayed 11 items.
- ML19257A893 (redirect page) (← links)
- 05000348/LER-1979-062-03, /03L-0:on 791204,during Turbine Load Reduction Due to Failed DEH Voltage/Frequency Converter,Indicated Axial Flux Difference Was Not Maintained within Tech Spec Band. Caused by Failed DEH Voltage to Frequency Converter (← links)
- 05000348/LER-1979-061-03, /03L-0:on 791202,while Making Change from Mode 1 to 2 & Securing Secondary Steam Loads,Atmospheric Relief Valve C Failed Open,Causing Reduction in RCS Average Temp to 531 F.Caused by Broken Positioning Arm.Valve Isolated (← links)
- 05000348/LER-1979-063-03, /03L-0:on 791204,flow Path from Bat a Was Inoperable Due to Outlet Valve Being Closed.Caused by Operator Error & Procedural Deficiencies.Valve Opened & Sys Returned to Operation (← links)
- 05000348/LER-1979-063 (redirect page) (← links)
- 05000348/LER-1979-059-03, /03L-0:on 791130,flow Path from Boric Acid Tank B Inoperable Due to Closed Outlet Valve.Caused by Operator Error.Valve Opened & Personnel Involved Received Training for Correct Procedure (← links)
- 05000348/LER-1979-059, Forwards LER 79-059/03L-0 (← links)
- 05000348/LER-1979-060-03, /03L-0:on 791202,while Moving from Mode 1 to 2, Containment Pressure Hi-1 & Hi-2 Trip Status Lights for One Channel Energized on Mcb W/Normal Readings on Containment Pressure Indicators.Caused by Comparator Card Failure (← links)
- 05000348/LER-1979-058-03, /03L-0:on 791121,boron Injection Tank Declared Inoperable Due to Low Concentration.Caused by Inadvertent Safety Injection.Concentration Increased by Batching (← links)
- 05000348/LER-1979-057-03, /03L-0:on 791122,steam Generator B Level Channel 486 Declared Inoperable Due to High Reading.Caused by Instruments Equalizing Valve Leaking.Valve Tightened,Tested & Returned to Operation (← links)
- 05000348/LER-1979-056-03, /03L-0:on 791108,20 Dysfunctional Fire Barrier Penetrations Found During QA Audit.Caused by Misinterpretation of Tech Specs by Plant Personnel. Inoperable Penetrations Repaired (← links)