Pages that link to "02PS-128A"
Jump to navigation
Jump to search
The following pages link to 02PS-128A:
Displaying 14 items.
- JAFP-18-0078, Fifth Ten-Year Interval Inservice Testing Program Plan (← links)
- JAFP-10-0033, Attachment 2 to JAFP-10-0033, Calculation JAF-CALC-NBS-02052, Revision 4 (← links)
- ML20092A421 (← links)
- ML20072A377 (← links)
- ML20137E983 (← links)
- IR 05000333/1996002 (← links)
- IR 05000333/1997002 (← links)
- JAFP-97-0218, Responds to NRC Re Violations Noted in Insp Rept 50-333/97-02.Corrective Actions:Placed Shutdown Cooling in Service After Resetting Isolation Logic & Refilling & Venting Sys IAW Plant Procedures & Revised Procedure OP-13D (← links)
- JAFP-95-0176, Annual Summary of Changes,Tests & Experiments for 1994. W/ (← links)
- 05000333/LER-1997-002, :on 970124,shutdown Cooling Isolation Occurred. Caused by Pressure Transient.Placed Shutdown Cooling in Service After Resetting Isolation Logic & Refilling & Venting Sys (← links)
- 05000333/LER-1993-012, :on 930519,shutdown Cooling Isolation Occurred Due to Air in Instrument Tubing for Pressure Switch 02PS-128A.Operating Procedure Revised to Vent Pressure Switch Instrument Lines for 02PS-128A & B (← links)
- 05000333/LER-1993-012-01, :on 930519,isolation Occurred When Rhr/Lpci Pump B Started in Shutdown Cooling Mode & Inboard & Outboard Isolation Valves Closed.Caused by Pressure Transient.Test Program Developed to Obtain Necessary Data (← links)
- 05000333/LER-1990-016, :on 900424,automatic Isolation Signal Closed Suction Valves from Reactor Water Recirculation Sys.On 900425,suction Valves Closed & RHR Pump Tripped.Caused by Chattering Pressure Switch.Switches Replaced (← links)
- 05000333/LER-1993-005, :on 930225,RHR/LPCI Started in Shutdown Cooling Mode & Isolation Valves Closed Upon Initial Startup of Pump. Caused by Procedure Deficiencies.Operating Procedure for RHR Shutdown Cooling Has Been Revised (← links)