Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085C081 + (TER Rept on First 10-Yr Interval ISI Program Plan for Braidwood Nuclear Power Station Units 1 & 2)
- ML20072R961 + (TER Review of ANO-1 CST Seismic Design)
- ML20127E306 + (TER for Evaluation of ODCM Rev 3,Shearon Harris Nuclear Power Plant,Unit 1)
- ML19086A179 + (TER for Moab Us Highway 191, & Historical Highway Rights-of-Way)
- ML20195B786 + (TER for Proposed Remedial Action at Naturity Uranium Mill Tailings Site Naturita,Co)
- ML18214A680 + (TER for Umetco Minerals Corporations Proposed 2018 Financial Assurance Surety Update for Their Gas Hills Uranium Milltailings Site, Fremont and Natrona Counties, Wy)
- ML20126E057 + (TER of BWROG In-Service Pressure Relief TS Rev Licensing Topical Rept NEDC-31753P)
- ML20107K016 + (TER of Hope Creek Nuclear Station IPE Back End Submittal, Final Rept)
- ML20078E150 + (TER of IPE Submittal Human Reliability Analysis, Final Rept, Task 23.Draft Dtd 940131,final Aug 1994)
- ML20107K023 + (TER of IPE Submittal Human Reliability Analysis, Final Rept)
- ML20101S045 + (TER of IPE Submittal,Human Reliability Analysis, Final Rept)
- ML20100F068 + (TER of IPE Submittal,Human Reliability Analysis, Final Rept)
- ML20129A858 + (TER of Plant IPE Back-End Submittal)
- ML18065A480 + (TER of Plant IPE Back-End Submittal - Final Rept)
- ML20101E203 + (TER of Plant IPE Back-End Submittal, Final Rept)
- ML20202G291 + (TER of TR EMF-85-74(P),Rev 0,Suppl 1 & 2, RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model)
- ML17289A945 + (TER of TR WPPS-FTS-127(Qualification of Core Physics Methods for BWR Design & Analysis) for Wpps 2)
- ML17223B323 + (TER of Topical Rept CEN-396-P (Verification of Acceptability of a 1-PIN Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2))
- ML20100F086 + (TER of Vermont Yankee Ipe,Back End Submittal, Final Rept)
- L-95-014, TER on First 10-Yr Interval ISI Program Plan:Tuec,Cpses, Unit 2 + (TER on First 10-Yr Interval ISI Program Plan:Tuec,Cpses, Unit 2)
- ML20073G037 + (TER on First 10-yr Interval Inservice Insp Program Plan: Philadelphia Electric Co,Limerick Generating Station,Unit 2)
- ML20078E047 + (TER on Front End IPE Submittal, Task 22,dtd 941004)
- ML20117D080 + (TER on IPE - Back-End Analysis)
- ML20140B658 + (TER on IPE Back End Analysis)
- ML20138F092 + (TER on IPE Back End Analysis)
- ML20128F441 + (TER on IPE Back-End Submittal)
- ML20107J996 + (TER on IPE Front End Analysis)
- ML20140B642 + (TER on IPE Front End Analysis)
- ML20138F081 + (TER on IPE Front End Analysis)
- ML20101E556 + (TER on IPE Submittal Human Reliability Analysis, 940831 Draft Rept & 950831 Final Rept)
- ML20107F945 + (TER on IPE Submittal Human Reliability Analysis Final Rept)
- ML18101B288 + (TER on IPE Submittal Human Reliability Analysis, Final Rept)
- ML20140B652 + (TER on IPE Submittal Human Reliability Analysis, Final Rept)
- ML20138K062 + (TER on IPE Submittal Human Reliability Analysis, Final Rept)
- ML20128F469 + (TER on IPE Submittal Human Reliability Analysis,Final Rept)
- ML20101E149 + (TER on Individual Plant Exam Front End Analysis)
- ML20100F061 + (TER on Ipe,Front End Analysis)
- ML20209G035 + (TER on Review of TMI-1 IPEEE Submittal on High Winds,Floods & Other External Events (Hfo))
- ML20084T102 + (TER on Second 10-Yr Interval ISI Program Plan:Duke Power Co for McGuire Nuclear Station,Unit 2)
- ML20138E635 + (TER on Second 10-Yr Interval ISI Program Plan:Fpl,St Lucie Nuclear Plant,Unit 2)
- ML20081E413 + (TER on Second 10-Yr Interval Inservice Insp Program Plan, Jm Farley Nuclear Power Plant Unit 1)
- ML20081E421 + (TER on Second 10-Yr Interval Inservice Insp Program Plan, Jm Farley Nuclear Power Plant Unit 2)
- L-95-004, TER on Third 10-Yr ISI Program Plan:Commonwealth Edison Co, Quad Cities Station,Units 1 & 2 + (TER on Third 10-Yr ISI Program Plan:Commonwealth Edison Co, Quad Cities Station,Units 1 & 2)
- L-96-017, TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station + (TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station)
- ML20076F002 + (TER on Third 10-Yr Interval ISI Program Plan:Northern States Power Co Monticello Nuclear Generating Plant)
- L-96-034, TER on Third 10-Yr Interval ISI Program Plan:Nppd Cns + (TER on Third 10-Yr Interval ISI Program Plan:Nppd Cns)
- ML20126M423 + (TER on Third 10-Yr Interval ISI Program Plan:Northeast Utils,Millstone Nuclear Power Station,Unit 1)
- L-96-028, TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant + (TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant)
- ML112380516 + (TER to Request for TS Change,Ielp,Cipc & Cbpc,Daec)
- ML20058L759 + (TER, BWR Transient Analysis Model WPPSS-FTS-129,Rev 1, for WPPSS WNP-2)
- ML20094P188 + (TER, Duane Arnold Energy Ctr Pump & Valve Inservice Testing Program,Rev 13,Third 10-Yr Interval)
- ML20069L535 + (TER, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001:Clinton)
- ML23053A226 + (TH17-RFranovich_Putting the Reasonable Back in Reasonable Assurance of Adequate Protection)