Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20262B541 + (Snupps Two Bay Safeguards Test Cabinet. Sheet 17)
- ML20262B546 + (Snupps Two Bay Safeguards Test Cabinet. Sheet 18)
- ML20262B549 + (Snupps Two Bay Safeguards Test Cabinet. Sheet 19)
- ML20262B475 + (Snupps Two Bay Safeguards Test Cabinet. Sheet 2)
- ML20262B480 + (Snupps Two Bay Safeguards Test Cabinet. Sheet 3)
- ML20262B484 + (Snupps Two Bay Safeguards Test Cabinet. Sheet 4)
- ML20262B489 + (Snupps Two Bay Safeguards Test Cabinet. Sheet 5)
- ML20262B493 + (Snupps Two Bay Safeguards Test Cabinet. Sheet 6)
- ML20262B497 + (Snupps Two Bay Safeguards Test Cabinet. Sheet 7)
- ML20262B499 + (Snupps Two Bay Safeguards Test Cabinet. Sheet 8)
- ML20262B503 + (Snupps Two Bay Safeguards Test Cabinet. Sheet 9)
- ML19253D817 + (Soar 2.5 User Guide)
- ML12024A379 + (Soarca Comparison to NUREG-1150, Res/Dra)
- ML12124A297 + (Soarca Documents Review/Approval Process)
- ML15097A076 + (Soarca Peach Bottom 2005 Site File)
- ML15097A114 + (Soarca Peach Bottom 2006 Meteorological File)
- ML13255A376 + (Soarca Peach Bottom Uncertainty Analysis (UA) Acrc Briefing - Sept 2013)
- ML12124A296 + (Soarca Peer Review Comments)
- ML18274A112 + (Soarca Project - PSAM14 Conference Paper and Presentation)
- ML12125A388 + (Soarca Project Appendix B Surry Integrated Analysis, W/Handwritten Notes)
- ML11255A352 + (Soarca Project Document List for the Peach Bottom Site)
- ML18274A116 + (Soarca Project Psam Presentation - September2018)
- ML11228A229 + (Soarca Seismic Issue; Briefing for the Commissioners Technical Assistants)
- ML17278A759 + (Soarca Sequoyah Updated Draft Executive Summary)
- ML15097A117 + (Soarca Surry 2004 Meteorological File)
- ML15097A078 + (Soarca Surry 2005 Site File)
- ML070530155 + (Soch Model Data Input (Unit 5))
- ML19262C416 + (Social & Economic Effects of Accident at TMI, Findings to Date)
- ML19210C714 + (Social & Economic Impacts of Trojan Nuclear Power Plant: Confirmatory Technology Assessment)
- ML041900209 + (Social Indicators - 2000, by the Southeastern Connecticut Council of Governments, June 2003)
- ML22273A013 + (Social Media Disclaimer 2022)
- ML21176A134 + (Social Scientists in an Adversarial Environment: the Nuclear Regulatory Commission and Organizational Factors Research)
- ML20206T114 + (Social,Economic & Political Impacts of National Waste Terminal Storage Repositories)
- ML20212F681 + (Society Corp 1985 Annual Rept)
- ML20135G763 + (Society of Nuclear Medicine and Molecular Imaging Town Hall - May 13, 2020 - Temporary Exemptions During the COVID-19 Public Health Emergency)
- ML19254F744 + (Socio-economic Monitoring & Mitigation Rept)
- ML20151J552 + (Socioeconomic Consequences of Nuclear Reactor Accidents)
- ML20138R932 + (Socioeconomic Impact Analysis of Electric Rate Increases in Rural West Central Illinois)
- ML20062B112 + (Socioeconomic Impacts of Nuclear Generating Stations: Calvert Cliffs Case Study.Docket Nos. 50-317 and 50-318. (Baltimore Gas and Electric Company))
- ML20062K086 + (Socioeconomic Impacts of Nuclear Generating Stations:Diablo Canyon Case Study.Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company))
- ML20062E192 + (Socioeconomic Impacts of Nuclear Generating Stations:Three Mile Island Case Study.Docket Nos. 50-289 and 50-320. (Metropolitan Edison,Et Al.))
- ML20062A854 + (Socioeconomic Impacts of Nuclear Generating Stations:Rancho Seco Case Study.Docket No. 50-312.(Sacramento Municipal Utility District))
- ML20062B078 + (Socioeconomic Impacts of Nuclear Generating Stations: Oconee Case Study.Docket Nos. 50-269 and 50-270.(Duke Power Company))
- ML20062E230 + (Socioeconomic Impacts of Nuclear Generating Stations: Arkansas Nuclear One Station Case Study.Docket Nos. 50-313 and 50-368.(Arkansas Power and Light Company))
- ML20062A864 + (Socioeconomic Impacts of Nuclear Generating Stations:Crystal River Unit 3 Case Study.Docket No. 50-302.(Florida Power Corporation))
- ML20062E204 + (Socioeconomic Impacts of Nuclear Generating Stations:Saint Lucie Case Study.Docket Nos. 50-335 and 50-389.(Florida Power and Light Company))
- ML20062H252 + (Socioeconomic Impacts of Nuclear Generating Stations.Summary Report on the NRC Post-Licensing Studies)
- ML20062A913 + (Socioeconomic Impacts of Nuclear Generating Stations:Surry Case Study.Docket Nos. 50-280 and 50-281.(Virginia Electric Power and Light Company))
- ML20058H658 + (Socioeconomic Impacts of Nuclear Generating Stations:Peach Bottom Case Study.Docket Nos. 50-277 and 50-278. (Philadelphia Electric Company))
- ML20062E225 + (Socioeconomic Impacts of Nuclear Generating Stations.D.C. Cook Case Study.Docket Nos. 50-315 and 50-316.(Indiana and Michigan Electric Company))
- ML20062G654 + (Socioeconomic Impacts of Nuclear Generating Stations:Nine Mile Plant and Fitzpatrick Case Study.Docket Nos. 50-220, 50-410 & 50-333.(Niagara Mohawk Power Corporation and Power Authority of the State of New York))