Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TSTF-305 + (Revise Actions for Exiting Physics Tests)
- TSTF-566 + (Revise Actions for Inoperable RHR Shutdown Cooling Subsystems)
- TSTF-571 + (Revise Actions for Inoperable Source Range Neutron Flux Monitor)
- TSTF-220 + (Revise Actions for Inoperable, Misaligned Apsr)
- NL-17-0190, Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidate Line Item Improvement Process + (Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidate Line Item Improvement Process)
- TSTF-100 + (Revise Adv Action B to State Restore All But One Adv to Operable Status)
- TSTF-592 + (Revise Automatic Depressurization System (ADS) Instrumentation Requirements)
- TSTF-514 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TSTF-114 + (Revise Bases for 3.4.7 to Address DHR Via Natural Circulation)
- TSTF-350 + (Revise Bases for Rspt SR 3.1.5.4)
- TSTF-111 + (Revise Bases for SRS 3.3.1.16 and 3.3.2.10 to Eliminate Pressure Sensor Response Time Testing)
- TSTF-559 + (Revise Bases to Reflect Revised SL Pressure Limit)
- TSTF-202 + (Revise Battery Surveillance Weekly Frequencies)
- TSTF-193 + (Revise CE Analog CEA Position Indication Verification)
- TSTF-436 + (Revise Channel Calibration Definition to Address NON-ADJUSTABLE Sensors)
- L-MT-14-065, Revise Commitment Date to Submit License Amendment Request for Adoption of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation + (Revise Commitment Date to Submit License Amendment Request for Adoption of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation)
- L-MT-15-009, Revise Commitment Date to Submit License Amendment Request for Adoption of TSTF-523, Revision 2, Generic Letter 2008-01. Managing Gas Accumulation + (Revise Commitment Date to Submit License Amendment Request for Adoption of TSTF-523, Revision 2, Generic Letter 2008-01. Managing Gas Accumulation)
- TSTF-095 + (Revise Completion Time for Reducing Power Range High Trip Setpoint from 8 to 72 Hours)
- TSTF-112 + (Revise Condition D in Tech Spec 3.2.3.A)
- TSTF-051 + (Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations)
- TSTF-123 + (Revise Control Rod Assemblies in Design Features to Match Definitions)
- TSTF-508 + (Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation)
- TSTF-154 + (Revise Criteria Discussions of Special Test Exceptions)
- TSTF-204 + (Revise DC Sources - Shutdown and Inverters - Shutdown to Address Specific Subsystem Requirements)
- TSTF-276 + (Revise DG Full Load Rejection Test)
- TSTF-356 + (Revise Ice Condenser Ice Sampling and Analysis Requirements)
- L-MT-09-010, Revise Implementation Date for the Power Range Neutron Monitoring System Upgrade License Amendment + (Revise Implementation Date for the Power Range Neutron Monitoring System Upgrade License Amendment)
- L-MT-06-009, Revise Implementation Period for the LAR for a Selective Scope Application of an Alternative Source Term Methodology for Re-evaluation of the Fuel Handling Accident + (Revise Implementation Period for the LAR for a Selective Scope Application of an Alternative Source Term Methodology for Re-evaluation of the Fuel Handling Accident)
- TSTF-401 + (Revise Incorrect Bases for Containment Air Temperature)
- TSTF-563 + (Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program)
- TSTF-196 + (Revise Isolation Devices to Include Asme/Ansi Equivalent Methods)
- TSTF-122 + (Revise LCO 3.0.2 Bases to Remove Possible Confusion)
- TSTF-585 + (Revise LCO 3.0.3 to Require Managing Risk)
- TSTF-296 + (Revise LCO 3.10.5, Single CRD Removal - Refueling, to Require a Withdrawal Block for All Other Rods)
- TSTF-177 + (Revise LCO 3.4.5 Bases to Clarify RCP Requirements)
- TSTF-337 + (Revise LCO 3.5.5 for RCP Seal Injection Flow Resistance)
- TSTF-146 + (Revise LCO 3.9.4 to Require One SDC LOOP Operable and in Operation)
- TSTF-257 + (Revise Leakage Detection Instrument Conditions to Eliminate Requirement to Enter LCO 3.0.3)
- TSTF-149 + (Revise Lhr SR to Be Consistent with the LCO)
- TSTF-319 + (Revise Main Turbine Bypass System to Address Adjustments to APLHGR Limits)
- TSTF-055 + (Revise Minimum to Maximum in Ltop Bases)
- TSTF-486 + (Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011))
- TSTF-097 + (Revise Note to SR 3.2.1.2, Fq Measurement)
- TSTF-513 + (Revise Operability Requirements and Actions for RCS Leakage Instrumentation)
- TSTF-515 + (Revise POST-ACCIDENT Monitoring Instrumentation Based on Reg Guide 1.97, Rev. 4 and NEDO-33349)
- TSTF-419 + (Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR)
- TSTF-309 + (Revise Pressurizer PORV Actions to Not Require Cycling of Block Valve When Closed for Isolation)
- TSTF-341 + (Revise Pressurizer Water Level Requirements)
- TSTF-506 + (Revise Primary Containment and Drywell Hydrogen Igniter Specification to Not Require Recombiners)
- TSTF-066 + (Revise RCS Specific Activity LCO)