Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-46978, Request for Alternative RBS-ISI-014, Proposed Alternative to 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections + (Request for Alternative RBS-ISI-014, Proposed Alternative to 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections)
- RBG-46977, Request for Alternative RBS-ISI-015 Proposed Alternative to 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections + (Request for Alternative RBS-ISI-015 Proposed Alternative to 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections)
- CNRO-2004-00003, Request for Alternative RBS-PT-001 - Proposed Alternative to ASME Section Xl Visual Examination Requirements + (Request for Alternative RBS-PT-001 - Proposed Alternative to ASME Section Xl Visual Examination Requirements)
- ML051790202 + (Request for Alternative RBS-PT-001, Response to NRC Request for Additional Information)
- ML15168A024 + (Request for Alternative RPV-U1 - Extension to Allow Use of Alternate Reactor Inspection Interval Requirements for the Third 10-Year Inservice Inspection Interval)
- ML073190511 + (Request for Alternative RR-A30, Revision 2 to Use Proposed Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Requirements for Structural Weld Overlays (Tac No. MD4452))
- ML073230183 + (Request for Alternative RR-A31 for Pressurizer J-Groove Nozzle Weld Repairs (Tac No. MD5956))
- ML17061A202 + (Request for Alternative RR-PR-03 Regarding Nuclear Service Cooling Water Pump Instrument Accuracy)
- NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves + (Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves)
- ML21154A211 + (Request for Alternative Requirements for ASME Section III Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16))
- EPID:L-2021-LLR-0041 + (Request for Alternative Requirements for ASME Section III Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16))
- ML25122A102 + (Request for Alternative Requirements for Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-02 for Steam Generator Welds)
- ML25044A033 + (Request for Alternative Requirements for Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-03 for Pressurizer Welds)
- RS-24-016, Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations + (Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations)
- ML23293A305 + (Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations)
- ML16235A228 + (Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants)
- ML16130A471 + (Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants)
- ML091910502 + (Request for Alternative VRR-ANO2-2008-1 for Third 10-Year Inservice Testing Interval)
- ML093370316 + (Request for Alternative VRR-ANO2-2009-1, Requirements for Frequency of Leak Rate Test for Two Service Water Boundary Isolation Valves for the Fourth 10-Year Inservice Testing Interval)
- GNRO-2007/00076, Request for Alternative VRR-GGNS-2007-01 and VRR-GGNS-2007-02 Requests for Alternative from ASME OM Code 5-Year Test Interval for Main Steam Safety Relief Valves + (Request for Alternative VRR-GGNS-2007-01 and VRR-GGNS-2007-02 Requests for Alternative from ASME OM Code 5-Year Test Interval for Main Steam Safety Relief Valves)
- W3F1-2012-0099, Request for Alternative W3-1SI-021, ASME Code Case N-770-1 Baseline Examination Request for Alternative + (Request for Alternative W3-1SI-021, ASME Code Case N-770-1 Baseline Examination Request for Alternative)
- ML113330137 + (Request for Alternative W3-CISI-002 to ASME Code, Section XI, IWE-5221 for Post-repair Testing of Steel Containment Vessel Opening, Third 10-Year Inservice Inspection Interval)
- CNRO-2007-00011, Request for Alternative W3-ISI-002, Request to Extend the Current ASME Inservice Inspection Interval in Accordance with NRC Information Notice 98-44 + (Request for Alternative W3-ISI-002, Request to Extend the Current ASME Inservice Inspection Interval in Accordance with NRC Information Notice 98-44)
- ML080250491 + (Request for Alternative W3-ISI-003 to ASME Code Requirements to Allow Extension to Second 10-Year Inservice Inspection Interval Beyond That Currently Allowed by ASME Subsection IWA-2340(d))
- CNRO-2007-00020, Request for Alternative W3-ISI-003, Proposed Alternative to Extend the Second 10 - Year Inservice Inspection Interval for Reactor Vessel Internal Weld Examinations + (Request for Alternative W3-ISI-003, Proposed Alternative to Extend the Second 10 - Year Inservice Inspection Interval for Reactor Vessel Internal Weld Examinations)
- CNRO-2007-00027, Request for Alternative W3-ISI-004 Proposed Alternative to Second Interval ISI Examinations + (Request for Alternative W3-ISI-004 Proposed Alternative to Second Interval ISI Examinations)
- ML080980120 + (Request for Alternative W3-ISI-005, Request to Use ASME Code Case N-716)
- ML072920433 + (Request for Alternative W3-ISI-005, Request to Use ASME Code Case N-716)
- W3F1-2007-0046, Request for Alternative W3-ISI-005, Request to Use ASME Code Case N-716 + (Request for Alternative W3-ISI-005, Request to Use ASME Code Case N-716)
- ML101600569 + (Request for Alternative W3-ISI-015, Inspection of Reactor Vessel Head In-Core Instrument Nozzles for Third 10-Year Inservice Inspection Interval)
- W3F1-2009-0056, Request for Alternative W3-ISI-015, Inspection of Reactor Vessel Head In-Core Instrument Nozzles During Third Ten-Year Inservice Inspection Interval Waterford Steam Electric Station, Unit 3 + (Request for Alternative W3-ISI-015, Inspection of Reactor Vessel Head In-Core Instrument Nozzles During Third Ten-Year Inservice Inspection Interval Waterford Steam Electric Station, Unit 3)
- ML101470453 + (Request for Alternative W3-ISI-016, Inspections of Reactor Vessel Heat Control Element Drive Mechanism Nozzles, for Third 10-Year Inservice Inspection Interval)
- W3F1-2009-0058, Request for Alternative W3-ISI-016, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During Third Ten-Year Inservice Inspection Interval + (Request for Alternative W3-ISI-016, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During Third Ten-Year Inservice Inspection Interval)
- ML112570273 + (Request for Alternative W3-ISI-018 from Inservice Inspection Requirements of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles, Third 10-Year Inservice Inspection Interval)
- W3F1-2011-0013, Request for Alternative W3-ISI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval + (Request for Alternative W3-ISI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval)
- ML112570168 + (Request for Alternative W3-ISI-019 from Inservice Inspection Requirements of Reactor Vessel Head In-Core Instrument Nozzles, Third 10-Year Inservice Inspection Interval)
- W3F1-2011-0014, Request for Alternative W3-ISI-019, Inspection of Reactor Vessel Head In-Core Instrument Nozzles During the Third Ten-Year Inservice Inspection Interval + (Request for Alternative W3-ISI-019, Inspection of Reactor Vessel Head In-Core Instrument Nozzles During the Third Ten-Year Inservice Inspection Interval)
- W3F1-2012-0085, Request for Alternative W3-ISI-020, ASME Code Case N-770-1 Baseline Examination Request + (Request for Alternative W3-ISI-020, ASME Code Case N-770-1 Baseline Examination Request)
- ML13128A129 + (Request for Alternative W3-ISI-020, ASME Code Case N-770-1 Baseline Examination Request for the Third 10-Year Inservice Inspection Interval)
- ML13192A222 + (Request for Alternative W3-ISI-021, ASME Code Case N-770-1 Baseline Examination Request for the Third 10-Year Inservice Inspection Interval)
- W3F1-2013-0044, Request for Alternative W3-ISI-023, ASME Code Case N-770-1 Successive Examinations + (Request for Alternative W3-ISI-023, ASME Code Case N-770-1 Successive Examinations)
- ML14070A008 + (Request for Alternative W3-ISI-023, ASME Code Case N-770-1 Successive Examinations, Third 10-Year Inservice Inspection Interval)
- CNRO-2005-00031, Request for Alternative W3-R&R-003 Proposed Alternative to ASME Requirements for Weld Repairs + (Request for Alternative W3-R&R-003 Proposed Alternative to ASME Requirements for Weld Repairs)
- CNRO-2006-00009, Request for Alternative W3-R&R-005, Proposed Alternative to ASME Requirements for Evaluating Postulated Flaw Remnants + (Request for Alternative W3-R&R-005, Proposed Alternative to ASME Requirements for Evaluating Postulated Flaw Remnants)
- CNRO-2007-00021, Request for Alternative W3-R&R-006 Proposed Alternative to ASME Code Requirements for Weld Overlay Repairs + (Request for Alternative W3-R&R-006 Proposed Alternative to ASME Code Requirements for Weld Overlay Repairs)
- L-09-309, Request for Alternative Weld Repair Method for Reactor Vessel Head Penetration J-Groove Welds for 10 CFR 50.55a + (Request for Alternative Weld Repair Method for Reactor Vessel Head Penetration J-Groove Welds for 10 CFR 50.55a)
- ML20307A017 + (Request for Alternative for Core Support Structure Weld Examination)
- ML20346A097 + (Request for Alternative for Examination of Reactor Pressure Vessel Threads in Flange)
- RA-20-0328, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals + (Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals)
- EPID:L-2021-LLR-0004 + (Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals)
- 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) + (Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037))
- EPID:L-2023-LLR-0028 + (Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037))
- NL-25-0008, Request for Alternative for Inservice Testing of the 2A and 2B Charging Pumps in Accordance with 10 CFR 50.55a(z)(2) + (Request for Alternative for Inservice Testing of the 2A and 2B Charging Pumps in Accordance with 10 CFR 50.55a(z)(2))