Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML11175A173 + (Relief Requests RR-47, RR-48, RR-49, and RR-50 for the Third Party Interval Inservice Inspection Program Plan)
- ML18331A060 + (Relief Requests Regarding Examination Coverage for Pressurizer Nozzle Inner Radius Section and Certain Stainless Steel Piping Welds (S1-I5-LMT-C01 and S1-I5-LMT-P01))
- ML061870011 + (Relief Requests Related to the Fourth 10-Year Interval Inservice Testing (IST) Program (TAC Nos. MC8713, MC8784 & MC8785))
- ML100900129 + (Relief Requests VEGP-ISI-ALT-04 (Units 1 and 2) and VEGP-ISI-RR-01 (Unit 2) Inservice Inspection Alternatives for Third and Subsequent Inservice Inspection Intervals)
- NL-18-1181, Relief Requests VEGP-ISI-RR-05 and VEGP-ISI-RR-06, SNC Response to NRC Request for Additional Information + (Relief Requests VEGP-ISI-RR-05 and VEGP-ISI-RR-06, SNC Response to NRC Request for Additional Information)
- RBG-47737, Relief Requests for 10-year Updates to the 120-Month Inservice Testing Intervals + (Relief Requests for 10-year Updates to the 120-Month Inservice Testing Intervals)
- L-PI-03-015, Relief Requests for 3rd 10-Year Inservice Inspection Intervals for Prairie, Units 1 & 2 + (Relief Requests for 3rd 10-Year Inservice Inspection Intervals for Prairie, Units 1 & 2)
- ML12009A073 + (Relief Requests for Dissimilar Metal Butt Welds Baseline Inspections (RR-ISI-04-06 & ISI-04-07))
- ML14329A185 + (Relief Requests for Fifth 10-Year Inservice Testing Program Interval (Tac Nos. MF3928 and MF3929))
- ML033180469 + (Relief Requests for Fourth 10-year Inservice Testing Program Interval (TAC No. MB7489 Through MB7494))
- ML082270205 + (Relief Requests for Inservice Pressure Testing)
- RA-21-0169, Relief Requests for Inservice Testing Plan - Sixth Interval + (Relief Requests for Inservice Testing Plan - Sixth Interval)
- RA-24-0137, Relief Requests for Inservice Testing Plan – Fifth Interval + (Relief Requests for Inservice Testing Plan – Fifth Interval)
- RA-21-0095, Relief Requests for Inservice Testing Program Plan - Sixth Ten-Year Interval + (Relief Requests for Inservice Testing Program Plan - Sixth Ten-Year Interval)
- EPID:L-2021-LLR-0024 + (Relief Requests for Inservice Testing Program Plan - Sixth Ten-Year Interval)
- ML16172A135 + (Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval)
- ML20312A001 + (Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval)
- AEP-NRC-2011-23, Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval + (Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval)
- ML12076A027 + (Relief Requests for Limited Coverage Inspections Response to Request for Additional Information)
- ML083010237 + (Relief Requests for Reactor Vessel Shell-to-Flange, and Nozzle to Safe-end Weld Examination)
- B18657, Relief Requests for Second Ten Year Interval of Inservice Inspection Program + (Relief Requests for Second Ten Year Interval of Inservice Inspection Program)
- ML091550244 + (Relief Requests for Temporary Non-Code Repair of Emergency Diesel Generator Heat Exchangers)
- ML022070476 + (Relief Requests for Third 10 Year Inservice Inspection (ISI) Interval)
- ML052450257 + (Relief Requests for Third 10-Year Pump & Valve Inservice Testing Program)
- CNRO-2009-00001, Relief Requests for Third 120 Month Inservice Inspection Interval + (Relief Requests for Third 120 Month Inservice Inspection Interval)
- CNRO-2008-00016, Relief Requests for Third 120 Month Inservice Testing Interval + (Relief Requests for Third 120 Month Inservice Testing Interval)
- ML022130527 + (Relief Requests for the 3rd 10-year Inservice Inspection Intervals for Unit 1 & 2 of Prairie Island Nuclear Generating Plant)
- GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing + (Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing)
- EPID:L-2024-LLR-0007 + (Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing)
- ML18117A264 + (Relief Requests for the Fifth 10-Year Interval Inservice Testing Program for Pumps and Valves)
- ML13238A398 + (Relief Requests for the Fifth 10-Year Inservice Testing Program Interval)
- GO2-24-102, Relief Requests for the Fifth Inservice Inspection Interval + (Relief Requests for the Fifth Inservice Inspection Interval)
- EPID:L-2024-LLR-0074 + (Relief Requests for the Fifth Inservice Inspection Interval)
- ML14141A073 + (Relief Requests for the Fourth 10-Year Inservice Inspection Interval (TAC Nos. MF2705 Through MF2714))
- ML081410070 + (Relief Requests for the Fourth 10-Year Interval Inservice Testing Program for Pumps and Valves (TAC Nos. MD5998 to MD6018))
- ML093220090 + (Relief Requests for the Fourth 10-Year Interval Inservice Inspection Program)
- ML14122A197 + (Relief Requests for the Fourth 10-Year Inservice Testing Interval (TAC Nos. MF2905 Through MF2912 and MF2915))
- ML082470622 + (Relief Requests for the Fourth 10-Year Pump and Valve Inservice Testing Programs, Respectively (TAC Nos. MD7763 Through MD7771))
- ML072910422 + (Relief Requests for the Fourth Interval Inservice Testing Program)
- ML021830577 + (Relief Requests for the Second 10-Year Inservice Inspection (ISI) Interval)
- ML020510484 + (Relief Requests for the Second 10-year ISI)
- ML16069A199 + (Relief Requests for the Third 10-Year Inservice Inspection Interval (CAC Nos. MF6302 Through MF6307))
- ML060550447 + (Relief Requests for the Third 10-year Pump and Valve Inservice Testing Program)
- CPSES-200200025, Relief Requests from 1986 Edition of ASME Code, Section XI, No Addenda, Inservice Inspection (ISI) A-4 Through A-8 + (Relief Requests from 1986 Edition of ASME Code, Section XI, No Addenda, Inservice Inspection (ISI) A-4 Through A-8)
- HNP-06-091, Relief Requests from ASME Code Inservice Testing Requirements to Allow Online Disassembly of Certain Check Valves + (Relief Requests from ASME Code Inservice Testing Requirements to Allow Online Disassembly of Certain Check Valves)
- ML020560602 + (Relief Requests from IST and ASME Code, Section III, Requirements (Tac Nos. MB3271 and MB3272))
- NRC 2004-0089, Relief Requests from the Provisions of ASME Section Xl, IWA-5244, Buried Components, RR-1-26 and RR-2-34 + (Relief Requests from the Provisions of ASME Section Xl, IWA-5244, Buried Components, RR-1-26 and RR-2-34)
- ML030870073 + (Relief Requests of 8/1/02)
- ML090360460 + (Relief Requests of Reactor Vessel Weld Examinations)
- ML17263A059 + (Relief Requests to Allow Use of Proposed Alternatives to Implement Requirements of ASME Code, for Reactor Pressure Vessel Welds for the Third ISI Interval)
- LR-N09-0126, Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination + (Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination)