Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14198A157 + (Relief Requests PR-03 and PR-05 Regarding the Inservice Testing Program (Tac MF0370))
- ML081050003 + (Relief Requests PRR-01, -02, -03, -04, -05, and VRR-01 for Third 10-Year Pump and Valve Inservice Testing Program Interval)
- LIC-02-0142, Relief Requests Pertaining to the Fort Calhoun Inservice Inspection (ISI) of the Reactor Pressure Vessel (RPV) for the Third Ten Year ISI Interval (1993-2003) + (Relief Requests Pertaining to the Fort Calhoun Inservice Inspection (ISI) of the Reactor Pressure Vessel (RPV) for the Third Ten Year ISI Interval (1993-2003))
- ML12235A308 + (Relief Requests RBS-ISI-016 and RBS-ISI-017 Proposed Alternative to 10 CFR 50.55A Examination Requirements for Reactor Pressure Vessel Weld Inspections)
- ML060550473 + (Relief Requests RI-21, Revision 2, and RI-36 and Withdrawal of Relief Request RI-20)
- ML16123A131 + (Relief Requests RP-01, RP-02, RP-06, RP-08, and RV-01 Related to the Inservice Testing Program, Fourth 10-Year Interval)
- ML12082A094 + (Relief Requests RR-004, RR-005, and RR-006 of 2/28/12 Acceptable for Review)
- ML020730039 + (Relief Requests RR-02-19 and RR-02-20 Regarding Weld Examinations Applicable to the Second and Third Ten Year Inservice Inspection (ISI) Interval)
- ML100900200 + (Relief Requests RR-04-02, Alternative VT-2 Pressure Testing Requirements for the Lower Portion of the Reactor Pressure Vessel, and RR-04-03, Alternative Evaluation Criteria for Code Case N-513-2, Temporary Acceptance of Flaws in)
- ML121910350 + (Relief Requests RR-04-09 and IR-3-15, Use of Alternative Pressure/Flow Testing Requirements for Service Water System Supply Piping)
- ML093520152 + (Relief Requests RR-07 and RR-08 from the Requirements of the OM Code Inservice Testing of Safety Relief Valves)
- ML063070540 + (Relief Requests RR-111-03 and RR-111-04, Relief from Certain Examination Qualification Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code.,)
- ML091880161 + (Relief Requests RR-3-45 and RR-3-46 for Reactor Vessel Head Penetrations Examination)
- ML100960547 + (Relief Requests RR-42, RR-43, RR-44, RR-45, for the Third 10-Year Interval Inservice Inspection Program Plan)
- ML11175A173 + (Relief Requests RR-47, RR-48, RR-49, and RR-50 for the Third Party Interval Inservice Inspection Program Plan)
- ML18331A060 + (Relief Requests Regarding Examination Coverage for Pressurizer Nozzle Inner Radius Section and Certain Stainless Steel Piping Welds (S1-I5-LMT-C01 and S1-I5-LMT-P01))
- ML061870011 + (Relief Requests Related to the Fourth 10-Year Interval Inservice Testing (IST) Program (TAC Nos. MC8713, MC8784 & MC8785))
- ML100900129 + (Relief Requests VEGP-ISI-ALT-04 (Units 1 and 2) and VEGP-ISI-RR-01 (Unit 2) Inservice Inspection Alternatives for Third and Subsequent Inservice Inspection Intervals)
- NL-18-1181, Relief Requests VEGP-ISI-RR-05 and VEGP-ISI-RR-06, SNC Response to NRC Request for Additional Information + (Relief Requests VEGP-ISI-RR-05 and VEGP-ISI-RR-06, SNC Response to NRC Request for Additional Information)
- RBG-47737, Relief Requests for 10-year Updates to the 120-Month Inservice Testing Intervals + (Relief Requests for 10-year Updates to the 120-Month Inservice Testing Intervals)
- L-PI-03-015, Relief Requests for 3rd 10-Year Inservice Inspection Intervals for Prairie, Units 1 & 2 + (Relief Requests for 3rd 10-Year Inservice Inspection Intervals for Prairie, Units 1 & 2)
- ML12009A073 + (Relief Requests for Dissimilar Metal Butt Welds Baseline Inspections (RR-ISI-04-06 & ISI-04-07))
- ML14329A185 + (Relief Requests for Fifth 10-Year Inservice Testing Program Interval (Tac Nos. MF3928 and MF3929))
- ML033180469 + (Relief Requests for Fourth 10-year Inservice Testing Program Interval (TAC No. MB7489 Through MB7494))
- ML082270205 + (Relief Requests for Inservice Pressure Testing)
- RA-21-0169, Relief Requests for Inservice Testing Plan - Sixth Interval + (Relief Requests for Inservice Testing Plan - Sixth Interval)
- RA-24-0137, Relief Requests for Inservice Testing Plan – Fifth Interval + (Relief Requests for Inservice Testing Plan – Fifth Interval)
- RA-21-0095, Relief Requests for Inservice Testing Program Plan - Sixth Ten-Year Interval + (Relief Requests for Inservice Testing Program Plan - Sixth Ten-Year Interval)
- EPID:L-2021-LLR-0024 + (Relief Requests for Inservice Testing Program Plan - Sixth Ten-Year Interval)
- ML16172A135 + (Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval)
- ML20312A001 + (Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval)
- AEP-NRC-2011-23, Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval + (Relief Requests for Limited Coverage Examinations Performed in the Third 10-Year Inspection Interval)
- ML12076A027 + (Relief Requests for Limited Coverage Inspections Response to Request for Additional Information)
- ML083010237 + (Relief Requests for Reactor Vessel Shell-to-Flange, and Nozzle to Safe-end Weld Examination)
- B18657, Relief Requests for Second Ten Year Interval of Inservice Inspection Program + (Relief Requests for Second Ten Year Interval of Inservice Inspection Program)
- ML091550244 + (Relief Requests for Temporary Non-Code Repair of Emergency Diesel Generator Heat Exchangers)
- ML022070476 + (Relief Requests for Third 10 Year Inservice Inspection (ISI) Interval)
- ML052450257 + (Relief Requests for Third 10-Year Pump & Valve Inservice Testing Program)
- CNRO-2009-00001, Relief Requests for Third 120 Month Inservice Inspection Interval + (Relief Requests for Third 120 Month Inservice Inspection Interval)
- CNRO-2008-00016, Relief Requests for Third 120 Month Inservice Testing Interval + (Relief Requests for Third 120 Month Inservice Testing Interval)
- ML022130527 + (Relief Requests for the 3rd 10-year Inservice Inspection Intervals for Unit 1 & 2 of Prairie Island Nuclear Generating Plant)
- GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing + (Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing)
- EPID:L-2024-LLR-0007 + (Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing)
- ML18117A264 + (Relief Requests for the Fifth 10-Year Interval Inservice Testing Program for Pumps and Valves)
- ML13238A398 + (Relief Requests for the Fifth 10-Year Inservice Testing Program Interval)
- GO2-24-102, Relief Requests for the Fifth Inservice Inspection Interval + (Relief Requests for the Fifth Inservice Inspection Interval)
- EPID:L-2024-LLR-0074 + (Relief Requests for the Fifth Inservice Inspection Interval)
- ML14141A073 + (Relief Requests for the Fourth 10-Year Inservice Inspection Interval (TAC Nos. MF2705 Through MF2714))
- ML081410070 + (Relief Requests for the Fourth 10-Year Interval Inservice Testing Program for Pumps and Valves (TAC Nos. MD5998 to MD6018))
- ML093220090 + (Relief Requests for the Fourth 10-Year Interval Inservice Inspection Program)
- ML14122A197 + (Relief Requests for the Fourth 10-Year Inservice Testing Interval (TAC Nos. MF2905 Through MF2912 and MF2915))