Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Relief Requests for Inservice Testing Plan - Sixth Interval". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML14198A157  + (Relief Requests PR-03 and PR-05 Regarding the Inservice Testing Program (Tac MF0370))
  • ML081050003  + (Relief Requests PRR-01, -02, -03, -04, -05, and VRR-01 for Third 10-Year Pump and Valve Inservice Testing Program Interval)
  • LIC-02-0142, Relief Requests Pertaining to the Fort Calhoun Inservice Inspection (ISI) of the Reactor Pressure Vessel (RPV) for the Third Ten Year ISI Interval (1993-2003)  + (Relief Requests Pertaining to the Fort Calhoun Inservice Inspection (ISI) of the Reactor Pressure Vessel (RPV) for the Third Ten Year ISI Interval (1993-2003))
  • ML12235A308  + (Relief Requests RBS-ISI-016 and RBS-ISI-017 Proposed Alternative to 10 CFR 50.55A Examination Requirements for Reactor Pressure Vessel Weld Inspections)
  • ML060550473  + (Relief Requests RI-21, Revision 2, and RI-36 and Withdrawal of Relief Request RI-20)
  • ML16123A131  + (Relief Requests RP-01, RP-02, RP-06, RP-08, and RV-01 Related to the Inservice Testing Program, Fourth 10-Year Interval)
  • ML12082A094  + (Relief Requests RR-004, RR-005, and RR-006 of 2/28/12 Acceptable for Review)
  • ML020730039  + (Relief Requests RR-02-19 and RR-02-20 Regarding Weld Examinations Applicable to the Second and Third Ten Year Inservice Inspection (ISI) Interval)
  • ML100900200  + (Relief Requests RR-04-02, Alternative VT-2 Pressure Testing Requirements for the Lower Portion of the Reactor Pressure Vessel, and RR-04-03, Alternative Evaluation Criteria for Code Case N-513-2, Temporary Acceptance of Flaws in)
  • ML121910350  + (Relief Requests RR-04-09 and IR-3-15, Use of Alternative Pressure/Flow Testing Requirements for Service Water System Supply Piping)
  • ML093520152  + (Relief Requests RR-07 and RR-08 from the Requirements of the OM Code Inservice Testing of Safety Relief Valves)
  • ML063070540  + (Relief Requests RR-111-03 and RR-111-04, Relief from Certain Examination Qualification Requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code.,)
  • ML091880161  + (Relief Requests RR-3-45 and RR-3-46 for Reactor Vessel Head Penetrations Examination)
  • ML100960547  + (Relief Requests RR-42, RR-43, RR-44, RR-45, for the Third 10-Year Interval Inservice Inspection Program Plan)
  • ML11175A173  + (Relief Requests RR-47, RR-48, RR-49, and RR-50 for the Third Party Interval Inservice Inspection Program Plan)
  • ML18331A060  + (Relief Requests Regarding Examination Coverage for Pressurizer Nozzle Inner Radius Section and Certain Stainless Steel Piping Welds (S1-I5-LMT-C01 and S1-I5-LMT-P01))
  • ML061870011  + (Relief Requests Related to the Fourth 10-Year Interval Inservice Testing (IST) Program (TAC Nos. MC8713, MC8784 & MC8785))
  • ML100900129  + (Relief Requests VEGP-ISI-ALT-04 (Units 1 and 2) and VEGP-ISI-RR-01 (Unit 2) Inservice Inspection Alternatives for Third and Subsequent Inservice Inspection Intervals)
  • NL-18-1181, Relief Requests VEGP-ISI-RR-05 and VEGP-ISI-RR-06, SNC Response to NRC Request for Additional Information  + (Relief Requests VEGP-ISI-RR-05 and VEGP-ISI-RR-06, SNC Response to NRC Request for Additional Information)
  • RBG-47737, Relief Requests for 10-year Updates to the 120-Month Inservice Testing Intervals  + (Relief Requests for 10-year Updates to the 120-Month Inservice Testing Intervals)
  • L-PI-03-015, Relief Requests for 3rd 10-Year Inservice Inspection Intervals for Prairie, Units 1 & 2  + (Relief Requests for 3rd 10-Year Inservice Inspection Intervals for Prairie, Units 1 & 2)
  • ML12009A073  + (Relief Requests for Dissimilar Metal Butt Welds Baseline Inspections (RR-ISI-04-06 & ISI-04-07))
  • ML14329A185  + (Relief Requests for Fifth 10-Year Inservice Testing Program Interval (Tac Nos. MF3928 and MF3929))
  • ML033180469  + (Relief Requests for Fourth 10-year Inservice Testing Program Interval (TAC No. MB7489 Through MB7494))
  • ML082270205  + (Relief Requests for Inservice Pressure Testing)