Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2018-LLR-0127 + (Relief Request 14R-OB, Revision 1, Associated with Pressure Testing of Containment Atmospheric Control Penetration Piping)
- ML15083A045 + (Relief Request 15-MN-001, Reactor Vessel Cold Leg Nozzle Dissimilar Metal (DM) Weld Inspection)
- ML15323A254 + (Relief Request 15-MN-003 Regarding Weld Examination Coverage)
- MNS-16-007, Relief Request 15-MN-003, Limited Weld Examinations, Response to Request for Additional Information + (Relief Request 15-MN-003, Limited Weld Examinations, Response to Request for Additional Information)
- MNS-15-048, Relief Request 15-MN-003, Limited Weld Examinations + (Relief Request 15-MN-003, Limited Weld Examinations)
- ML15349A453 + (Relief Request 15-ON-001 Repair of Low Pressure Service Water System Piping)
- ML16004A262 + (Relief Request 15-ON-004: Limited Visual Examinations of the Reactor Pressure Vessel Support Skirt for the Fourth 10-Year Inservice Inspection Interval Program)
- ML17010A137 + (Relief Request 16-MN-001, Limited Weld Examinations During Fourth 10-Year Interval Inservice Inspection Interval)
- MNS-16-036, Relief Request 16-MN-001, Limited Weld Examinations + (Relief Request 16-MN-001, Limited Weld Examinations)
- MNS-16-053, Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping + (Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping)
- MNS-16-062, Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping + (Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping)
- CNS-17-039, Relief Request 17-CN-002, Request for Alternative Method to Establish New Inservice Testing Values for a Chemical and Volume Control Pump + (Relief Request 17-CN-002, Request for Alternative Method to Establish New Inservice Testing Values for a Chemical and Volume Control Pump)
- ML17061A505 + (Relief Request 17-MN-001, Alternative for Repair of Class 1 Piping)
- MNS-17-012, Relief Request 17-MN-001, Alternative for Repair of Class 1 Piping + (Relief Request 17-MN-001, Alternative for Repair of Class 1 Piping)
- L-2003-187, Relief Request 19 Risk-Informed Inservice Inspection Program + (Relief Request 19 Risk-Informed Inservice Inspection Program)
- ML20042D714 + (Relief Request 19-ON-002 for Proposed Alternative to Reactor Vessel Nozzle Weld Examination Frequency Requirements in ASME Code Case N-770-2)
- ML20196L829 + (Relief Request 1A3-2, Inservice Inspection (ISI))
- ML20196L824 + (Relief Request 1A3-2, Inservice Inspection (Isi), Table 1)
- CP-202000431, Relief Request 1A4-1 Supplement - Reactor Vessel (Rv) Upper Head Examinations + (Relief Request 1A4-1 Supplement - Reactor Vessel (Rv) Upper Head Examinations)
- ML20196L828 + (Relief Request 1A4-1, Reactor Vessel (Rv) Upper Head Examinations)
- ML20196L827 + (Relief Request 1A4-2, Reactor Vessel (Rv) Bottom Mounted Instrumentation (Bmi) Nozzle Penetration Examination)
- CP-201500402, Relief Request 1B3-3 Inservice Inspection for Application of an Alternative to ASME Boiler & Pressure Vessel Code Section XI Examination Requirements for Reactor Pressure Vessel Cold Leg Weld Inspection Frequency + (Relief Request 1B3-3 Inservice Inspection for Application of an Alternative to ASME Boiler & Pressure Vessel Code Section XI Examination Requirements for Reactor Pressure Vessel Cold Leg Weld Inspection Frequency)
- ML16074A001 + (Relief Request 1B3-3, Alternative for Reactor Pressure Vessel Cold Leg Weld Inspection Frequency from Not to Exceed 7 Years to 9 Years for the Third 10-Year Inservice Inspection Interval)
- ML15259A004 + (Relief Request 1B3-4, Alternative for Reactor Pressure Vessel Head Penetration Weld Inspection Frequency (from 10 to 15 Years), Third 10-Year Inservice Inspection Interval)
- ML071620136 + (Relief Request 2 for ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations)
- NL-09-107, Relief Request 2-10 for Fourth Ten-Year Inservice Inspection Interval + (Relief Request 2-10 for Fourth Ten-Year Inservice Inspection Interval)
- ML092170308 + (Relief Request 2-ISI-21 for the Third Ten-Year Interval Inservice Inspection Program Relate to the Examination of Piping Weld Overlays)
- ML13120A180 + (Relief Request 2-ISI-28, for the Third 10-Year Inservice Inspection Interval)
- ML17045A772 + (Relief Request 2-ISI-30 and 3-ISI-27 - Relief from ASME Code, Section XI Requirements for Periods of Extended Operation for RPV Circumferential Shell Weld Examinations)
- NRC 2019-0026, Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure + (Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure)
- ML020530412 + (Relief Request 2204)
- ML032110542 + (Relief Request 23 Alternative to Temper Bead Welding Requirements for Inservice Inspection Program (Tac. MB8973, MB8974 and MB8975))
- CP-201500244, Relief Request 2A3-1 for Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds (2007 Edition of ASME Code + (Relief Request 2A3-1 for Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds (2007 Edition of ASME Code)
- ML15257A242 + (Relief Request 2A3-1, from ASME Code Section XI Requirements, Risk-Informed Process for Selection of Class 1 and Class 2 Piping Weld Examinations, Third 10-Year Inservice Inspection Interval)
- CP-201700120, Relief Request 2B3-1 Third Ten Year Inservice Inspection Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations + (Relief Request 2B3-1 Third Ten Year Inservice Inspection Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations)
- ML15257A240 + (Relief Request 2C3-1, from ASME Code, Section XI Requirements Reactor Pressure Vessel Leak-Off Flange for the Third 10-Year Inservice Inspection Interval)
- ML083190494 + (Relief Request 2ISI-007 and 2ISI-009 for Third 10-Year ISI Interval)
- ML022560217 + (Relief Request 2ISI-25 to Inservice Inspection (ISI) Program Plan for Second Inspection Interval)
- PLA-6404, Relief Request 2RR07 for Third Ten-Year Interval Inservice Testing Program Plan + (Relief Request 2RR07 for Third Ten-Year Interval Inservice Testing Program Plan)
- ML14087A134 + (Relief Request 3-008 from ASME Section XI, Subsection IWA-4422.1 to Allow Temporary Non-Code Repair to Service Water Piping)
- NL-13-147, Relief Request 3-008 from ASME Section XI, Subsection IWA-4422.1 to Allow Temporary Non-Code Repair to Service Water Piping + (Relief Request 3-008 from ASME Section XI, Subsection IWA-4422.1 to Allow Temporary Non-Code Repair to Service Water Piping)
- L-90-005, Relief Request 3-43 for Temporary Repair to Service Water Pipe + (Relief Request 3-43 for Temporary Repair to Service Water Pipe)
- ML032120222 + (Relief Request 33 Regarding Qualification Requirements for Inspection of Dissimilar Metal Piping Welds)
- ML090690154 + (Relief Request 38, Relief from Certain ASME Code Requirements for Weld Examinations, Second 10-year Inservice Inspection Interval)
- SBK-L-20049, Relief Request 3IIR-7, Proposed Alternative to Deter Examinations Beyond the 1 Year Code Allowable + (Relief Request 3IIR-7, Proposed Alternative to Deter Examinations Beyond the 1 Year Code Allowable)
- EPID:L-2020-LLR-0055 + (Relief Request 3IIR-7, Proposed Alternative to Deter Examinations Beyond the 1 Year Code Allowable)
- ML13109A005 + (Relief Request 3IS1-13 for Temporary Non-Code Repair of Reactor Water Cleanup System Piping - Comment Change)
- ML13191A054 + (Relief Request 3ISI-12, Use of Code Case N-795, Alternative Requirements for BWR Class 1 System Leakage Test Pressure Following Repair/Replacement Activities)
- ML13108A218 + (Relief Request 3ISI-13 for Temporary Non-Code Repair of Reactor Water Cleanup System Piping)
- ML15036A220 + (Relief Request 3ISI-14 - Use of Code Case N-702 for Nozzle-Vessel Weld and Inner Radius Exams for the Third 10-Year Inservice Inspection Interval)
- ML15037A005 + (Relief Request 3ISI-15 - Reactor Pressure Vessel Head Flange Leak-off Line, for the Third 10-Year Inservice Inspection Interval)